Filter interviews by
MIS creation involves gathering, analyzing, and presenting data to support decision-making.
MIS involves collecting data from various sources such as databases, spreadsheets, and reports.
The data is then analyzed to identify trends, patterns, and insights.
The analyzed data is presented in the form of reports, dashboards, and visualizations to aid decision-making.
Examples of MIS include sales reports, inventory tracking
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Different practical situation for handling the situation
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
Process of board meeting and annual general meetings.
The process of changing the registered office from one state to another and extending the AGM.
To change the registered office from one state to another, the company needs to follow the legal procedures and obtain necessary approvals.
The process typically involves obtaining approval from the board of directors and shareholders, filing necessary documents with the Registrar of Companies, and publishing public notices.
The...
Director report and other annexure related questions and disclosure in annual filing
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I was interviewed before Jun 2023.
The username of LA is typically a combination of letters, numbers, or symbols chosen by the user for identification purposes.
Usernames are unique identifiers used for logging into accounts or accessing online platforms.
LA could stand for Los Angeles, so the username might include references to the city or abbreviations like 'LA' or 'LAX'.
It could also be a personalized username chosen by the individual, such as 'LAlove
Transformer works on the principle of electromagnetic induction to transfer electrical energy between two or more circuits.
Transformers have two coils of wire, known as primary and secondary coils, wrapped around a core made of iron or steel.
When an alternating current flows through the primary coil, it creates a changing magnetic field around the core.
This changing magnetic field induces a voltage in the secondary coi...
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
Some of the top questions asked at the Adani Green Energy HSE Executive interview -
based on 1 interview
Interview experience
Assistant Manager
469
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
330
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
261
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
207
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
186
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power
Azure Power
ReNew
Hero Future Energies