Upload Button Icon Add office photos

Filter interviews by

Abj Engineering And Contracting Co Kwait Instrumentation Technician Interview Questions, Process, and Tips

Updated 17 Jul 2024

Top Abj Engineering And Contracting Co Kwait Instrumentation Technician Interview Questions and Answers

Abj Engineering And Contracting Co Kwait Instrumentation Technician Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which is the term and conditions.?
  • Q2. Monthly celery?
Round 2 - Technical 

(2 Questions)

  • Q1. What is your Company name?
  • Q2. How much celery per month?
  • Ans. 

    The amount of celery consumed per month varies depending on personal preferences and dietary habits.

    • The amount of celery consumed per month can range from a few stalks to several bunches, depending on individual consumption habits.

    • Some people may eat celery as a snack every day, while others may only include it in certain recipes occasionally.

    • Factors such as availability, cost, and personal taste preferences can also i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Instrument technician I oil & gas fild including petrochemical.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Control valve assembly Cv taype Tx all type Cv troubleshoot Celebration
  • Q2. Mos full from Pos full from CE
  • Ans. 

    The question is asking about the terms 'Mos full from', 'Pos full from', and 'CE' in the context of instrumentation technician.

    • Mos full from likely refers to Maximum Operating System Full From

    • Pos full from could be related to Position Full From

    • CE might stand for Control Element

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Abj Engineering And Contracting Co Kwait Instrumentation Technician interview:
  • Metance
Interview preparation tips for other job seekers - Good

Instrumentation Technician Interview Questions Asked at Other Companies

asked in ADNOC
Q1. What kind of precautions need in Plant running time?
asked in ADNOC
Q2. How many types vibration is there in field?
Q3. 1) verious types of Transmetters like PT,LT,FT AND DPT must knowl ... read more
Q4. Which type PLC & DCS in your plant make and models
asked in ADNOC
Q5. Are you know that preventive maintenance jobs?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Newspaper Ad and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Low and Low Low different
  • Ans. 

    Low and Low Low are different alarm levels used in process control systems to indicate different levels of severity.

    • Low typically indicates a warning or caution level, while Low Low indicates a critical or emergency level

    • Low may trigger a notification for maintenance or monitoring, while Low Low may require immediate action or shutdown

    • Examples: Low pressure alarm vs Low Low pressure alarm in a boiler system

    • Different ac...

  • Answered by AI
  • Q2. Explain dcs system
  • Ans. 

    DCS system stands for Distributed Control System, which is a computerized control system used to control and monitor industrial processes.

    • DCS system consists of multiple control stations distributed throughout a plant or facility.

    • It allows for centralized control and monitoring of various processes from a single location.

    • DCS systems are commonly used in industries such as oil and gas, power generation, and manufacturin...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Panel wiring

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Campus Placement and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Introduce yourself?? What project do you done in your education? Explain your project? Do you comfortable to shift pune?
  • Q2. Why we need to hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident on your answer whether it is wrong or right.. Don't be panic.. Just study basics of automobile subject before the interview..
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What do you know about Kone, and why do you want to work for this company How do you keep up with the
  • Q2. Can you walk me through the steps you take to ensure safety protocols are followed on a job site?
  • Ans. 

    I ensure safety protocols by implementing a comprehensive plan and training workers on safety measures.

    • Develop a safety plan specific to the job site

    • Train workers on safety procedures and provide necessary safety equipment

    • Conduct regular safety inspections and address any hazards immediately

    • Ensure compliance with all relevant safety regulations and standards

    • Encourage workers to report any safety concerns or incidents

    • Ho...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - What you doing today lift from turbhe the building name is gami jade

I applied via Walk-in and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. One on one round and other one
  • Q2. On company rules or ur rules
Round 3 - Technical 

(1 Question)

  • Q1. I know errection and maintenance ..

Interview Preparation Tips

Interview preparation tips for other job seekers - May very much wish to work in your company ।।।।।।।।

I applied via Company Website and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Engineer Drawing all the parameters
  • Q2. TPM pillers

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare drawing well
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Types of current
  • Ans. 

    There are two types of current: direct current (DC) and alternating current (AC).

    • Direct current (DC) flows in one direction only, typically produced by batteries or power supplies.

    • Alternating current (AC) periodically changes direction, commonly used in household electrical systems.

    • DC is used in electronic devices like computers and cell phones, while AC powers appliances and lighting.

    • Examples of DC include car batteri...

  • Answered by AI
  • Q2. What is volltage value L-L and L-N
  • Ans. 

    Voltage value L-L is the voltage between two phases, while L-N is the voltage between a phase and neutral.

    • Voltage value L-L is also known as line-to-line voltage.

    • Voltage value L-N is also known as line-to-neutral voltage.

    • L-L voltage is typically higher than L-N voltage in a three-phase system.

    • For example, in a 120/208V three-phase system, the L-L voltage is 208V, while the L-N voltage is 120V.

  • Answered by AI
  • Q3. Explain about step and step down transformer
  • Ans. 

    A step-up transformer increases voltage while a step-down transformer decreases voltage.

    • Step-up transformer increases voltage from primary to secondary winding

    • Step-down transformer decreases voltage from primary to secondary winding

    • Step-up transformers are used in power transmission to increase voltage for long-distance transmission

    • Step-down transformers are used in power distribution to decrease voltage for consumer u...

  • Answered by AI

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2024.

Round 1 - HR 

(1 Question)

  • Q1. How many Engineering Documents will be process if you handle EPC project?
  • Ans. 

    The number of Engineering Documents processed in an EPC project varies depending on the size and complexity of the project.

    • The number of Engineering Documents processed in an EPC project can range from hundreds to thousands.

    • These documents include drawings, specifications, calculations, reports, and other technical documents.

    • The exact number of documents will depend on the scope of the project, the number of discipline...

  • Answered by AI

Abj Engineering And Contracting Co Kwait Interview FAQs

How many rounds are there in Abj Engineering And Contracting Co Kwait Instrumentation Technician interview?
Abj Engineering And Contracting Co Kwait interview process usually has 1-2 rounds. The most common rounds in the Abj Engineering And Contracting Co Kwait interview process are Technical and Resume Shortlist.
What are the top questions asked in Abj Engineering And Contracting Co Kwait Instrumentation Technician interview?

Some of the top questions asked at the Abj Engineering And Contracting Co Kwait Instrumentation Technician interview -

  1. How much celery per mon...read more
  2. Mos full from Pos full from...read more
  3. Low and Low Low differ...read more

Tell us how to improve this page.

Abj Engineering And Contracting Co Kwait Instrumentation Technician Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
ABB Interview Questions
4.1
 • 243 Interviews
John Deere Interview Questions
4.1
 • 237 Interviews
Cummins Interview Questions
4.3
 • 235 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
KONE Interview Questions
4.1
 • 109 Interviews
Atlas Copco Interview Questions
4.2
 • 85 Interviews
View all

Abj Engineering And Contracting Co Kwait Instrumentation Technician Reviews and Ratings

based on 3 reviews

4.5/5

Rating in categories

4.5

Skill development

4.5

Work-life balance

4.5

Salary

4.5

Job security

4.5

Company culture

4.3

Promotions

4.5

Work satisfaction

Explore 3 Reviews and Ratings
Design Engineer
7 salaries
unlock blur

₹16 L/yr - ₹21 L/yr

Quality Control Inspector
7 salaries
unlock blur

₹15 L/yr - ₹16.6 L/yr

Estimation Engineer
5 salaries
unlock blur

₹20 L/yr - ₹26 L/yr

Senior Electrical Technician
5 salaries
unlock blur

₹3 L/yr - ₹16.6 L/yr

Instrument Engineer
4 salaries
unlock blur

₹20 L/yr - ₹24 L/yr

Explore more salaries
Compare Abj Engineering And Contracting Co Kwait with

John Deere

4.1
Compare

Thermax Limited

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview