I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.
Power is the rate at which energy is transferred. Current is the flow of electric charge. Voltage is the electric potential difference.
Power is measured in watts and is calculated by multiplying voltage and current.
Current is measured in amperes and is the flow of electric charge through a conductor.
Voltage is measured in volts and is the electric potential difference between two points in a circuit.
Ohm's law relates p...
Top trending discussions
posted on 30 May 2024
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Increasing business can be achieved through various strategies.
Identify target audience and tailor marketing efforts accordingly
Offer promotions and discounts to attract new customers
Improve customer service to retain existing customers
Expand product or service offerings to attract a wider audience
Collaborate with other businesses to reach new markets
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
posted on 25 Apr 2024
I applied via Referral and was interviewed before Apr 2023. There were 3 interview rounds.
posted on 23 Feb 2024
Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.
Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.
It is expressed as a percentage and indicates how efficiently a power plant is being utilized.
A high plant load factor i...
Machine availability is the percentage of time a machine is able to be used for its intended purpose.
Machine availability is calculated by dividing the total operating time by the total time in a given period, then multiplying by 100.
For example, if a machine operates for 800 hours in a month and there are 1000 total possible operating hours, the availability would be 80%.
Factors like downtime, maintenance, and repairs
posted on 13 Oct 2022
WTG stands for Wind Turbine Generator. Yaw drive system is responsible for orienting the turbine blades into the wind.
WTG converts wind energy into electrical energy
Yaw drive system rotates the nacelle to face the wind
Yaw drive system consists of yaw motor, yaw brake, and yaw bearing
Yaw motor receives signals from the controller to rotate the nacelle
Yaw brake holds the nacelle in position during maintenance or high win