Site Engineer/Site Supervisor
Site Engineer/Site Supervisor Interview Questions and Answers

Asked in Manikaran Power Limited

Q. What is the relationship between frequency and wavelength?
Frequency and wavelength are inversely proportional to each other.
Frequency is the number of waves that pass a point in a given time period.
Wavelength is the distance between two consecutive points on a wave that are in phase.
The higher the frequency, the shorter the wavelength.
The lower the frequency, the longer the wavelength.
The formula to calculate the speed of a wave is wavelength x frequency.
Examples: Radio waves have a low frequency and long wavelength, while X-rays ha...read more
Asked in Hassan Road Construction Company

Q. According to the drawing provided, what is the depth of the foundation from ground level?
The depth of foundation from gl can be determined by referencing the provided drawing.
Refer to the drawing provided to locate the ground level (gl)
Measure the distance from the ground level to the bottom of the foundation to determine the depth
Ensure that the foundation depth meets the required specifications for the construction project
Asked in Hassan Road Construction Company

Q. What is the clear cover for a foundation?
Clear cover for foundation is the minimum distance between the outer surface of the reinforcement and the outer surface of the concrete.
Clear cover is important to protect the reinforcement from corrosion and ensure durability of the structure.
The clear cover for foundation is typically specified in the structural drawings or codes.
The clear cover requirements may vary based on the type of foundation and the environmental conditions.
For example, the clear cover for a foundati...read more

Asked in Manikaran Power Limited

Q. What is a Class A chopper?
Class A chopper is a type of electronic switch used in power electronics.
Class A chopper is a type of DC-DC converter.
It is used to regulate the voltage or current in a circuit.
It operates in the linear region of the transistor.
It has high efficiency and low ripple.
Examples include buck-boost chopper, forward chopper, and flyback chopper.
Asked in Hassan Road Construction Company

Q. BBS for footing and pedestrian arrangement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure. It is essential for ensuring the structural integrity of footings and pedestrian arrangements.
BBS includes details such as bar diameter, spacing, length, and shape for each reinforcement bar in the footing and pedestrian arrangement.
It is crucial to follow the BBS accurately to ensure the proper strength and stability of the structure.
For example, in a footing, the BBS will spe...read more
Asked in Hassan Road Construction Company

Q. Quantity calculation for footing
Quantity calculation for footing involves determining the volume of concrete required for the foundation.
Calculate the volume of the footing by multiplying the length, width, and depth of the footing.
Convert the volume to cubic meters by dividing by 27 (for cubic feet to cubic yards conversion).
Multiply the volume by the density of concrete (typically around 2400 kg/m^3) to get the total weight of concrete needed.
Consider adding extra concrete for wastage and ensure proper re...read more

Asked in Konecranes

Q. Explain how a VFD works.
A Variable Frequency Drive (VFD) is an electronic device used to control the speed and torque of an electric motor.
VFD converts the fixed frequency and voltage of the power supply to a variable frequency and voltage.
It adjusts the motor speed by varying the frequency of the electrical input.
VFDs use pulse width modulation (PWM) to control the output voltage and frequency.
They provide smooth acceleration and deceleration of the motor, reducing mechanical stress.
VFDs can save e...read more

Asked in Gem Engserv

Q. What is the standard deviation of M25 grade concrete?
Standard deviation is a measure of the amount of variation or dispersion of a set of values from its mean.
Standard deviation of M25 concrete is a measure of the variation of compressive strength values of M25 grade concrete.
It is calculated using the formula: σ = √(Σ(xi - x̄)² / n), where σ is the standard deviation, xi is the individual value, x̄ is the mean value, and n is the number of values.
The standard deviation of M25 concrete is typically around 4-5 N/mm².
It is importan...read more
Share interview questions and help millions of jobseekers 🌟
Asked in SURYA INTERNATIONAL ENTERPRISE

Q. Unit weight of steel
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is approximately 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
The unit weight of steel is an important factor in structural engineering calculations.
Asked in Kamat & Rozario Architecture

Q. What is the size of a brick?
The size of a brick can vary depending on the type and country of origin.
The standard size of a brick in the UK is 215mm x 102.5mm x 65mm.
In the US, the standard size is 203mm x 92mm x 57mm.
Bricks can also come in different shapes and sizes for specific purposes.
The size of a brick can affect the amount of mortar needed for construction.
Interview Experiences of Popular Companies






Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary


Reviews
Interviews
Salaries
Users

