Production Team Lead

Production Team Lead Interview Questions and Answers

Updated 18 Feb 2025
search-icon

Q1. What is OEE and method of its calculation

Ans.

OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.

  • OEE is calculated by multiplying three factors: Availability, Performance, and Quality.

  • Availability measures the percentage of time that the equipment is available for production.

  • Performance measures the speed at which the equipment operates compared to its ideal speed.

  • Quality measures the percentage of good-quality products produced by the equipment.

  • OEE = Ava...read more

Q2. Type of instruments used during manufacturing process

Ans.

Various instruments are used during the manufacturing process to ensure quality and efficiency.

  • Measuring instruments like calipers and micrometers are used to ensure precise dimensions.

  • Testing instruments like spectrometers and chromatographs are used to analyze the composition of materials.

  • Control instruments like programmable logic controllers (PLCs) are used to monitor and regulate the manufacturing process.

  • Cutting and shaping instruments like drills and lathes are used to...read more

Q3. What's QCPC chart.

Ans.

A QCPC chart is a quality control process chart used to monitor and improve production processes.

  • QCPC stands for Quality Control Process Chart.

  • It is a visual tool used to monitor and improve production processes.

  • It helps identify trends, patterns, and areas for improvement in the production process.

  • Examples include control charts, Pareto charts, and scatter diagrams.

Q4. Please explain FMEA?

Ans.

FMEA stands for Failure Mode and Effects Analysis, a systematic method for identifying and preventing potential failures in a process or product.

  • FMEA involves identifying potential failure modes, determining their effects, and prioritizing them based on severity, occurrence, and detection.

  • It helps in proactively addressing potential issues before they occur, leading to improved quality and reliability.

  • FMEA is commonly used in industries such as manufacturing, automotive, aero...read more

Production Team Lead Jobs

Team Lead Production 5-7 years
Sartorius
3.8
Bangalore / Bengaluru
Are these interview questions helpful?
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.3
 • 14 Interviews
3.8
 • 12 Interviews
3.9
 • 6 Interviews
4.3
 • 3 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Production Team Lead Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter