Q1. Explain about different cable sizes , ratings ,& why we use 4sq.mm for A.Cs why not 1.5/2.5 sqmm wire?

Ans.

Different cable sizes and ratings are used for different applications, with 4sq.mm wire commonly used for A.Cs due to its capacity to handle higher current.

  • Cable size refers to the cross-sectional area of the conductor, with larger sizes able to carry more current.

  • Ratings indicate the maximum current capacity and voltage that a cable can safely handle.

  • 4sq.mm wire is commonly used for A.Cs because air conditioners typically require higher current for operation.

  • Using a smaller ...read more

Q2. Explain me basic toilet size & what are the plumbing & electricals mounting systems required with measurement

Ans.

The basic toilet size is typically around 1.5 to 2 feet wide and 2 to 3 feet long. Plumbing and electrical mounting systems required include water supply lines, drainage pipes, and electrical outlets.

  • Toilet size is usually 1.5 to 2 feet wide and 2 to 3 feet long

  • Plumbing mounting systems include water supply lines and drainage pipes

  • Electrical mounting systems may require outlets for lighting or exhaust fans

Q3. What are type of materials used in plumbing system , Ewc outlet height as per Indian norms

Ans.

Common materials used in plumbing systems include copper, PVC, PEX, and galvanized steel. The EWC outlet height as per Indian norms is typically around 16 inches.

  • Common materials used in plumbing systems: copper, PVC, PEX, galvanized steel

  • EWC outlet height as per Indian norms is around 16 inches

Q4. What is minimum elecrical points required and what's the measurements & load calculation

Ans.

The minimum electrical points required depend on the size and layout of the building, with load calculations based on the appliances and equipment being used.

  • Minimum electrical points required are determined by the size and layout of the building.

  • Load calculations should be based on the appliances and equipment being used.

  • Measurements for electrical points should adhere to local building codes and regulations.

  • Consult with a licensed electrician to ensure proper placement and ...read more

Are these interview questions helpful?

Q5. Tell me about worksequence of both plumbing & electrical

Ans.

In plumbing work, the sequence typically involves rough-in, installation of fixtures, testing, and final inspection. For electrical work, the sequence includes rough-in, wiring, installation of devices, testing, and final inspection.

  • Plumbing work sequence: rough-in, installation of fixtures, testing, final inspection

  • Electrical work sequence: rough-in, wiring, installation of devices, testing, final inspection

Q6. Explain & draw circuit diagram about electrical Distribution board in residential building

Ans.

An electrical distribution board in a residential building is a panel that distributes electricity to different circuits and appliances.

  • The distribution board receives power from the main supply and distributes it to various circuits in the building.

  • It contains circuit breakers or fuses to protect each circuit from overloading.

  • Each circuit is connected to the distribution board through individual circuit breakers or fuses.

  • The distribution board also includes a main switch for...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. Explain Fire systems & pump room &FAPA, ETC

Ans.

Fire systems include fire alarm systems, fire pumps, and fire protection systems like FAPA.

  • Fire systems are designed to detect and suppress fires in buildings.

  • Fire alarm systems alert occupants of a fire emergency.

  • Fire pumps are used to provide water pressure for fire sprinkler systems.

  • FAPA stands for Fire Alarm Public Address system, which combines fire alarm and public address functions.

  • The pump room houses the fire pumps and related equipment for fire protection systems.

Q8. Water supply & drainage type

Ans.

Water supply can be either direct or indirect, while drainage can be either single stack or separate system.

  • Water supply can be direct, where water is supplied directly from the mains to the fixtures, or indirect, where water is stored in a tank and then supplied to the fixtures.

  • Drainage can be a single stack system, where all waste water is collected in a single stack and then discharged into the sewer, or a separate system, where foul water and surface water are collected s...read more

Plumbing and Fire Fighting Enguneer Jobs

0
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 5 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Plumbing and Fire Fighting Enguneer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter