Q1. What type of document required for starting a substation project . Starting for initial to final stage .
Various documents are required for starting a substation project, from initial to final stage.
Feasibility study report
Environmental impact assessment report
Design and engineering drawings
Equipment specifications and procurement documents
Construction and installation documents
Commissioning and testing documents
Operation and maintenance manuals
As-built drawings and records
Q2. How to make QAP and what content are required .
A QAP should include procedures, standards, and guidelines for quality assurance in a project.
Identify the project's quality objectives
Define the quality standards and procedures
Establish the roles and responsibilities of the quality team
Determine the quality control and inspection processes
Outline the corrective action procedures
Include documentation requirements
Ensure compliance with relevant regulations and standards
Q3. Prepare a check list to audit Transmission line project as per ISO 9000:2015.
Checklist for auditing Transmission line project as per ISO 9000:2015
Verify if the project meets the requirements of ISO 9000:2015
Check if the project has a quality management system in place
Ensure that the project has documented procedures for all processes
Verify that the project has a system for monitoring and measuring performance
Check if the project has a system for corrective and preventive actions
Ensure that the project has a system for internal audits and management re...read more
Manager Inspection Jobs
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month