EXT Project Engineer

EXT Project Engineer Interview Questions and Answers

Updated 17 May 2018

Q1. Wiring diagram of 2-wire ,3-wire ,4-wire transmittors

Ans.

A wiring diagram shows the connections between components in a transmitter.

  • 2-wire transmitters have power and signal wires combined into a single pair

  • 3-wire transmitters have separate power, signal, and ground wires

  • 4-wire transmitters have separate power, signal, and ground wires, plus an additional shield wire for noise protection

Q2. Difference between HMI and SCADA

Ans.

HMI stands for Human Machine Interface and is a user interface that allows interaction between humans and machines. SCADA stands for Supervisory Control and Data Acquisition and is a system used to monitor and control industrial processes.

  • HMI is typically used for local control and monitoring of machines or processes.

  • SCADA is used for remote monitoring and control of multiple machines or processes.

  • HMI usually has a graphical interface with buttons, switches, and indicators fo...read more

Are these interview questions helpful?
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.8
 • 16 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

EXT Project Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter