Deputy Project Manager
50+ Deputy Project Manager Interview Questions and Answers
Q1. If contractors not compliance spec. Then what do you want or take action against.
Take appropriate action against contractors not complying with specifications.
Identify the specific non-compliance issues
Communicate the non-compliance to the contractors
Request corrective actions or modifications to meet the specifications
Monitor and document the progress of corrective actions
Consider penalties or contract termination if non-compliance persists
Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?...
read moreFEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.
FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.
Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.
SIL (Safety Integrity Level) is a measure of the effectiveness of safety systems in reducin...read more
Deputy Project Manager Interview Questions and Answers for Freshers
Q3. Work experience in Depillaring with continuous miner project, using method of fish & bone, nevid method, their strata monitoring instrument used, and follow up for safety precautions to handled the situation....
read moreDepillaring work experience with continuous miner project using fish & bone, nevid method, strata monitoring instruments, and safety precautions.
I have worked on depillaring projects using continuous miner and fish & bone method.
I am familiar with the nevid method and have used it in my work experience.
I have experience using strata monitoring instruments to ensure safety during depillaring.
I always follow safety precautions and protocols to ensure a safe working environment....read more
Q4. What is your area of specialization?Define water cement ratio?Calculation of BOQ quantity?
I specialize in construction management.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
BOQ quantity refers to the Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
Calculation of BOQ quantity involves estimating the quantities of materials needed for a project based on the project's design and specifications.
Q5. Are you convenient in electrical drawings and layouts
Yes, I am proficient in reading and interpreting electrical drawings and layouts.
I have experience in reviewing and understanding electrical drawings and layouts
I am familiar with symbols, schematics, and diagrams commonly used in electrical engineering
I have successfully implemented projects based on electrical drawings and layouts
I can identify potential issues or improvements in electrical designs
Q6. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.
The quantity of prime coat depends on the type of bitumen extractor machine used
It is important to follow the manufacturer's instructions for the specific machine being used
Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed
Typically, the quantity of prime coat used ranges from 0.8 to 1.2 liters per sq. mt.
Regu...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Test of Slump cone and size , difference between centering and shuttering, steel test procedure, and process of ATT
The question covers topics related to testing procedures and construction processes.
Slump cone test measures the consistency of concrete mix.
Centering is the temporary support structure used during construction, while shuttering is the process of creating a mold for concrete.
Steel test procedure involves checking the quality and strength of steel used in construction.
ATT (Acceptance Test Procedure) is a process used to ensure that the construction project meets the required s...read more
Q8. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.
The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.
The type of bitumen extractor machine used can affect the quantity of tack coat used.
The thickness of the GSB layer can also impact the quantity of tack coat used.
Weather conditions such as temperature and humidity can aff...read more
Deputy Project Manager Jobs
Q9. How many cycling days scheduled to slab casting and details
The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.
Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.
Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.
For example, a smaller slab may only require 1-2 cycling days, while a larger and more complex slab may require 4-5 cyc...read more
Q10. Can you work with Tamil,telgu, Malayalam and kannad speaking people in organization.
Yes, I can work with Tamil, Telugu, Malayalam, and Kannada speaking people in the organization.
I have experience working with diverse teams and have developed communication skills to effectively collaborate with people from different backgrounds.
I am also willing to learn and adapt to new languages and cultures to ensure smooth communication and teamwork.
For example, in my previous job, I worked with a team that included members who spoke Tamil and Kannada, and I made an effo...read more
Q11. Which one is dependable to design of Rigid Pavement
The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.
Traffic load and volume
Subgrade soil conditions
Climate and weather conditions
Concrete mix design
Joint spacing and layout
Q12. Required compaction as per MORTH of dry lean concrete
The required compaction for dry lean concrete is specified by MORTH.
MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.
The compaction factor for dry lean concrete should be between 0.78 to 0.82.
The compaction should be done using a plate vibrator or a needle vibrator.
The required compaction can vary depending on the type of dry lean concrete being used.
Proper compaction is important to ensure the strength and durability of the dry lean ...read more
Q13. How much time will it take to commission 4Mwp solar GCRTSPP???
The time required to commission 4Mwp solar GCRTSPP depends on various factors such as site preparation, equipment availability, and weather conditions.
The site preparation work needs to be completed before the installation of solar panels can begin.
The availability of equipment such as solar panels, inverters, and transformers can affect the commissioning time.
Weather conditions such as rain or snow can delay the installation and commissioning process.
The experience and exper...read more
Q14. Cost to complition of project getting delay .how to make profite to company
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing or discounts to reduce costs.
Consider outsourcing certain t...read more
Q15. What's is the processing of concrete?
Processing of concrete involves mixing cement, water, and aggregates to create a strong and durable material.
Mixing cement, water, and aggregates in specific proportions
Pouring the mixture into molds or forms
Allowing the concrete to cure and harden over time
Finishing the surface of the concrete with tools or coatings
Testing the strength and durability of the finished product
Q16. What are the important deliverables in Project Management?
Important deliverables in Project Management include project charter, project plan, status reports, and final project deliverables.
Project charter: outlines project objectives, scope, and stakeholders.
Project plan: details tasks, timelines, resources, and budget.
Status reports: provide updates on project progress and any issues.
Final project deliverables: the end result or product of the project.
Q17. What about you know waterproofing of toilet area
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Proper surface preparation, including cleaning, leveling, an...read more
Q18. How do you manage cost in inline manufacturing
Cost management in inline manufacturing involves optimizing processes, reducing waste, and negotiating with suppliers.
Implementing lean manufacturing principles to reduce waste and improve efficiency
Negotiating with suppliers to get the best prices for materials and components
Regularly monitoring and analyzing costs to identify areas for improvement
Utilizing cost estimation tools and software to accurately predict expenses
Collaborating with cross-functional teams to ensure co...read more
Q19. How mainten safety and quality in project site
Safety and quality in project site are maintained through strict adherence to protocols and standards.
Establishing clear safety and quality guidelines
Providing regular training to workers on safety and quality protocols
Conducting regular inspections and audits to ensure compliance
Using appropriate safety equipment and tools
Encouraging workers to report any safety or quality concerns
Taking immediate action to address any safety or quality issues
Documenting all safety and quali...read more
Q20. Characteristics of concrete+1.65times and standard deviations
Concrete+1.65 times standard deviation refers to the strength of concrete at a certain level of confidence.
Concrete strength is measured in psi or MPa
Standard deviation is a measure of the variability of the strength test results
The higher the standard deviation, the more variable the test results
The 1.65 factor is used to determine the minimum strength required for a certain level of confidence
For example, a concrete mix with a strength of 4000 psi and a standard deviation o...read more
Q21. HVAC how can you calculate the are for AC
The area for AC can be calculated by multiplying the length and width of the room.
Measure the length and width of the room in feet or meters
Multiply the length by the width to get the area in square feet or square meters
For example, if the room is 10 feet long and 12 feet wide, the area for AC would be 120 square feet
Q22. How much percentage of slope in shoulder
The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.
The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.
The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.
The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and cyclists.
The slope of the shoulder can be steeper in mount...read more
Q23. How much slope in normal camber
The slope in normal camber varies depending on the design and purpose of the structure.
Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.
The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.
For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic loads.
The slope in normal camber should be carefully calc...read more
Q24. How much ur carpent area and buildup area
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area would be around 700-800 square feet.
Q25. Are you familiar with erp model.
Yes, ERP (Enterprise Resource Planning) model is a system used to manage and integrate the important parts of a business.
ERP model helps in streamlining processes and improving efficiency.
It integrates various functions like finance, HR, inventory, and customer relationship management.
Examples of ERP systems include SAP, Oracle, and Microsoft Dynamics.
Q26. How many customer events are there?
The number of customer events varies depending on the project and its scope.
The number of customer events can range from a few to several dozen, depending on the size and complexity of the project.
Customer events may include meetings, presentations, workshops, trainings, and feedback sessions.
Examples of customer events could be product demos, focus groups, user testing sessions, and milestone reviews.
Q27. What is calculation of MRS?
MRS stands for Management Reserve Schedule, which is a contingency budget set aside for unforeseen events.
MRS is calculated by multiplying the total project budget by a percentage set by the project manager.
The percentage is usually between 5-10% of the total budget.
MRS is used to cover unexpected costs or delays that may arise during the project.
It is important to have a well-defined MRS to ensure the project stays on track and within budget.
Q28. What is main element of Any Structure
The main element of any structure is its foundation.
The foundation provides stability and support for the entire structure
It distributes the weight of the structure evenly
Examples include concrete footings, pilings, and slabs
Q29. How to select the cooling tower?
Cooling towers should be selected based on factors like cooling capacity, water quality, energy efficiency, and maintenance requirements.
Consider the cooling capacity required for the specific application
Evaluate the water quality to determine if a specific type of cooling tower is needed
Look for energy-efficient options to reduce operational costs
Assess maintenance requirements to ensure ease of upkeep
Examples: Crossflow cooling towers, counterflow cooling towers, hybrid coo...read more
Q30. How to start any project ?
Starting a project involves defining goals, creating a plan, assembling a team, and securing resources.
Define project goals and objectives
Create a project plan with timelines and milestones
Assemble a team with the necessary skills and expertise
Secure resources such as funding, equipment, and materials
Establish communication channels and protocols
Identify potential risks and develop contingency plans
Monitor progress and adjust plans as necessary
Q31. Circumstances of handing over flat to Clint
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
Q32. How to manage Highway execution
Highway execution can be managed by proper planning, monitoring, and communication.
Create a detailed project plan with timelines and milestones
Regularly monitor progress and adjust plans as needed
Maintain open communication with stakeholders, including contractors and government officials
Ensure compliance with safety regulations and environmental standards
Manage budget and resources effectively
Anticipate and address potential issues before they become problems
Use technology a...read more
Q33. Kleanchute installation across residential apartments
Kleanchute installation involves implementing waste disposal systems in residential apartments.
Consider the layout and size of the apartments to determine the best placement for Kleanchutes.
Ensure proper ventilation and safety measures are in place during installation.
Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.
Q34. What are the node in Stadd Pro
Nodes in Stadd Pro are points where structural members meet or intersect.
Nodes are used to define the geometry of the structure.
Nodes are connected by members to form the structural system.
Nodes can have different properties assigned to them such as supports or loads.
Examples of nodes include column bases, beam ends, and connection points.
Q35. How to selection of transformer?
Transformers are selected based on factors like load requirements, voltage levels, efficiency, and cost.
Consider the load requirements to determine the kVA rating of the transformer.
Determine the primary and secondary voltage levels required for the application.
Evaluate the efficiency of the transformer to ensure optimal performance.
Compare costs of different transformer options to select the most cost-effective solution.
Q36. What is development length
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the design requirements and the specific project.
For example, ...read more
Q37. Please let us know types of floorings
Types of floorings include hardwood, laminate, tile, carpet, and vinyl.
Hardwood
Laminate
Tile
Carpet
Vinyl
Q38. Density of sleeper's in one km?
The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.
Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.
Density of people sleeping outdoors in one km would depend on the location and circumstances.
For example, in a homeless encampment, the density of sleepers in one km might be higher compared to a park where people are camping.
Q39. Define client management?
Client management involves building and maintaining relationships with clients to ensure their satisfaction and retention.
Understanding client needs and expectations
Communicating effectively with clients
Providing timely and quality service
Managing client feedback and complaints
Identifying opportunities for upselling or cross-selling
Maintaining accurate client records
Building long-term relationships with clients
Ensuring client satisfaction and retention
Q40. Construction drawing for super structure?
Construction drawing for superstructure is a detailed plan that shows the layout and design of the building's main framework.
Superstructure refers to the part of the building that is above the foundation and includes the walls, floors, and roof.
The construction drawing for superstructure includes details such as the dimensions, materials, and placement of beams, columns, and other structural elements.
These drawings are typically created by architects and engineers and are use...read more
Q41. How to manage a ongoin site
Managing an ongoing site involves coordinating tasks, monitoring progress, addressing issues, and ensuring timely completion.
Create a detailed project plan outlining tasks, timelines, and responsibilities.
Regularly communicate with team members to provide updates and address any issues.
Monitor progress and adjust plans as needed to ensure project stays on track.
Address any issues or roadblocks promptly to prevent delays.
Ensure all safety protocols are followed to maintain a s...read more
Q42. Concrete maximum tensile strength
The maximum tensile strength of concrete varies depending on the type and mix of concrete.
The maximum tensile strength of concrete is typically around 10% of its compressive strength.
Reinforcing concrete with steel bars can increase its tensile strength.
The maximum tensile strength of normal concrete is around 0.1-0.2% of its compressive strength.
High-strength concrete can have a maximum tensile strength of up to 10-15% of its compressive strength.
Q43. Development length of Welded Rod
Development length of Welded Rod is the length of the embedded portion of the rod required to develop the full strength of the rod.
Development length is influenced by factors such as diameter of the rod, type of material, and type of welding process used.
It is important to calculate the development length accurately to ensure the structural integrity of the welded rod.
Examples of factors affecting development length include the presence of any coatings on the rod and the qual...read more
Q44. Detail process of building survey
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with building codes and regulations
Document findings and prepare a det...read more
Q45. Maintain material register & formats
Maintaining a material register involves keeping track of all materials used in a project.
Create a register to record details of all materials used
Include information such as material type, quantity, and source
Update the register regularly to reflect any changes or additions
Use standardized formats to ensure consistency and ease of use
Examples of formats include spreadsheets, databases, or online tools
Q46. Hydraulics of water supply project
Understanding the hydraulics of a water supply project is crucial for ensuring efficient water distribution and management.
Hydraulics involves the study of fluid flow and pressure in pipes and channels
Factors such as pipe diameter, material, and elevation differences impact water flow
Pressure is needed to push water through the system, typically provided by pumps
Design considerations include flow rate, pressure requirements, and pipe sizing
Proper maintenance and monitoring ar...read more
Q47. Capable of what
Capable of managing project timelines, budgets, resources, and stakeholders to ensure successful project delivery.
Managing project timelines
Managing project budgets
Managing project resources
Managing project stakeholders
Ensuring successful project delivery
Q48. Design factor of steel
Design factor of steel refers to the safety factor used in structural design to account for uncertainties and variations in material properties.
Design factor is typically a value greater than 1 to ensure the structure can safely support the intended loads.
Common design factors for steel structures range from 1.5 to 2.5, depending on the level of risk and safety required.
Factors such as material quality, fabrication processes, and environmental conditions can influence the des...read more
Q49. Total Qty of steel in OHT.
The total quantity of steel in OHT is calculated by summing up the individual quantities of steel used in the construction.
Calculate the quantity of steel used in each component of the OHT (e.g. beams, columns, slabs, etc.)
Sum up the individual quantities to get the total quantity of steel in OHT
Consider any additional steel reinforcements or accessories used in the construction
Q50. Prepare a Boq of 1 km HT line
A Bill of Quantities (BoQ) for a 1 km HT line
Identify the required materials for the HT line
Estimate the quantities of each material needed
Calculate the cost of each material
Sum up the costs to prepare the BoQ
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month