Upload Button Icon Add office photos

Schneider Electric

Compare button icon Compare button icon Compare
filter salaries All Filters

527 Schneider Electric Jobs

Deputy Manager Methods

5-7 years

₹ 7.43 - 7.1L/yr (AmbitionBox estimate)

tooltip
This is an estimate of the average salary range for this position. It has not been reviewed by the company, and the actual salary may differ.

Chennai

1 vacancy

Deputy Manager Methods

Schneider Electric

posted 29d ago

Job Role Insights

Flexible timing

Job Description

(Quantitative or quality criteria to achieve responsibility)
Industrial Efficiency through continual improvements
Identify process related issues through SIM meetings; study the down time trends. Define problem areas and identify root cause. Propose solutions to eliminate the root cause; implement and evaluate effectiveness. Update process documents by incorporating the changes. Continually look for ways and means of improving productivity. Implement idea schemes within defined area of work. Maintain Update MTM dataon continual basis, revisit in case of process changes on yearly basis
Full
Industrial efficiency,
DLP
Capacity realization
Launching of new product
Receive the documents from industrial team for all new projects. Study, evaluate and identify improvement points if any; Incorporate them before launch of the product
Full
Product Launch report
Qualification of Benches
Study the basic machine design. Study the performance of the machine by producing a minimum of entire range on that particular machine. Validate the products produced with the support of quality. Study the time taken for production; Qualify the machine based on the results of the above study and tenderizing the historical quality level data of same/similar product
Full
Benches report
Conducting LIS
Conduct Line short run on the qualified machines to find the areas of improvements if any. Based on identified areas of improvement take corrective / preventive action, Implement the same as part of the system. Declare the suitability of lines and make them available for production
Full
Appropriate line suitability
Troubleshooting / Problem Solving on a daily basis
On a daily basis get to know quality issues, inadvertent breakdowns/ down time like change over adjustments, safety ergonomic related issues in the lines. Understand the problem and suggest alternative solution to immediately address the problem and regain production. Discuss with other product lines if required to identify and implement possible solutions; Work towards providing long term solutions to arrest the reoccurrence of the problem
Full
Capacity Realization
Process capabilities
Monitor and measure process capabilities periodically. Take action based on deviations from the quality, production, and supply chain ; Analyze the issues and improve the process; Take trials to revalidate the process and re-establish the process documents
Full
Run the process within acceptable process capability status
Capacity planning and manpower forecasting :
Receive long term Demand forecast from marketing for the next 3 years; Review capacity quarter-wise and take action to ensure capacity availability to meet the peek demands as per requirements; Check the capacity for both in-house and subcontractor capacities. Identify bottlenecks if any and work on removing the bottlenecks; Organize and implement the production facilities required for new capacity or for improved quality. Estimate manpower requirements for new capacity and inform HR for manpower planning. Ensure implementation of increased capacity on time such that, peak market demands are met as per requirements.
Full
30 % Excess Capacity
Implement ECNs (Engineering change notes)
Receive ECNs from the technical department; Study and find out implications on the existing process; Change the process to suit the ECN requirements; Update the relevant database and documents at the workstation. Call for prequalification of the processes as required. Train the concerned operators / supervisors to implement the changes; Manage change effectively.
Full
Run the process within acceptable process capability status
Implementation of SPS
Implement SPS in production and support functions with reference to lean procedures; Ensure optimization of production floor layouts. Understand LADM and ensure implementation of same; Ensure ergonomy and safety. Be Aware of TPM and make changes in process in line with TPM requirements; Ensure appropriate Methodology and optimization of Material providing and handling. Implement Poke yoke and FMEA where ever required.
Partial
Implementation of SPS audit score
Technology transfer from Projects
Learn the process from the projects team. Participate in the implementation, validation and qualification of the processes. Take charge of all technology transfer documents including drawings, test methods SOPs. Train the production team in implementation of the processes; Prepare and provide commissioning reports to the projects, maintenance and finance team.
Full
Establish process and achieve desired industrial efficiency
Handle Transfer Projects
Receive requirements from mother plant, define schedule for the projects; brief the projects with internal department like procurement, technical, logistics and production. Prepare samples and get validated. Support in preparation of product costing and logistics feasibility. Validate the process variability.
Full
Core Line Validation
SOP preparation and updations
Adhere to the changes and improvement made
Based on process changes update SOPs and define variant charts data regularly. Ensure training to the production team to implement changes
Full
Compliance
Annual Budget planning
Make budget provision for equipments, consumables, tools and seek approval for the same. Follow the budget and ensure expenses made within budget limits
Partial
Adhering to Budget limits
Prepare contingency plan by analyzing cost/lead time required in recreation/reviving of manufacturing facility in minimum possible time and least cost
Full
Education :
Basic : Mechanical/ Electrical/Automobile Engineering / Industrial Engineering Graduate
Job Related Experience:

Employment Type: Full Time, Permanent

Read full job description

Schneider Electric Interview Questions & Tips

Prepare for Schneider Electric roles with real interview advice

Top Schneider Electric Deputy Methods Manager Interview Questions

Q1. What is calibration? What will you do if instrument is out of calibration?
Q2. What will you do if you have to perform testing on site on pole?
Q3. 1) What happens when two positively charged material is placed together?
View all 214 questions

What people at Schneider Electric are saying

Deputy Methods Manager salary at Schneider Electric

reported by 2 employees with 5-7 years exp.
₹6.5 L/yr - ₹8.4 L/yr
32% less than the average Deputy Methods Manager Salary in India
View more details

What Schneider Electric employees are saying about work life

based on 3.8k employees
71%
47%
41%
95%
Flexible timing
Monday to Friday
No travel
Day Shift
View more insights

Schneider Electric Benefits

Job Training
Health Insurance
Free Transport
Soft Skill Training
Cafeteria
Free Food +6 more
View more benefits

Compare Schneider Electric with

Siemens

4.1
Compare

ABB

4.1
Compare

Honeywell Automation

3.8
Compare

Emerson Electric Co.

4.1
Compare

Eaton

3.9
Compare

Legrand

3.7
Compare

Rockwell Automation

3.7
Compare

Johnson Controls

3.6
Compare

Bosch

4.2
Compare

Wipro PARI

3.4
Compare

Addverb Technologies

3.6
Compare

Titan Engineering & Automation

4.0
Compare

Falcon Autotech

3.9
Compare

Technosoft Engineering Projects Limited

3.9
Compare

Festo

3.9
Compare

TMEIC

3.8
Compare

Cotmac Electronics

3.8
Compare

Marine Electricals

3.7
Compare

Utthunga Technologies

3.3
Compare

Siemens PLM Software

4.2
Compare

Similar Jobs for you

Senior Manager at Schneider Electric India Pvt. Ltd.

Hyderabad / Secunderabad

7-8 Yrs

₹ 9-10 LPA

Lead Engineer at GE India Industrial Private Limited

Bangalore / Bengaluru

3-8 Yrs

₹ 5-7 LPA

Design Engineer at Rachamallu Forgings

Hyderabad / Secunderabad

5-9 Yrs

₹ 5-9 LPA

Senior Engineer at Safran Aircraft Engine Services India Pvt Ltd

Hyderabad / Secunderabad, Shamshabad

5-8 Yrs

₹ 5-8 LPA

advanced lead engineer at GE India Industrial Private Limited

Bangalore / Bengaluru

5-8 Yrs

₹ 7-10 LPA

Methods at Ernst Young

Bangalore / Bengaluru

2-5 Yrs

₹ 4-7 LPA

Deputy Vendor Development Manager at Trask

Kolkata, Mumbai + 5

7-11 Yrs

₹ 6-11 LPA

Senior Associate 1 at RSM DELIVERY CENTER (INDIA) PRIVATE LIMITED

Bangalore / Bengaluru

3-5 Yrs

₹ 4-6 LPA

Deputy Sales Manager at Sika India Pvt. Ltd.

Rajkot

4-9 Yrs

₹ 7-12 LPA

Deputy Manager Operations at Mantras2Success Consultants

Mumbai

0-8 Yrs

₹ 7-12 LPA

Deputy Manager Methods

5-7 Yrs

Chennai

29d ago·via naukri.com

DGM / GM - DfSR

12-15 Yrs

Mumbai

1d ago·via naukri.com

Lead Functional Snr Analyst- Baxter

6-11 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Lead - Digital Business Analyst

3-7 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Kronos Technical Analyst

3-5 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Expert, Kronos Developer

4-7 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

HCM Integration Specialist

7-9 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Workforce Management Capability Architect

8-13 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Principal - Procurement Deployment Leader

10-12 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com

Sr Manager - Order Management

13-16 Yrs

Bangalore / Bengaluru

2d ago·via naukri.com
write
Share an Interview