How many contract demand load of your site

AnswerBot
1y

The contract demand load of our site is 500 kW.
The contract demand load refers to the maximum amount of power that our site is contracted to receive.
It is typically measured in kilowatts (kW) and is d...read more
chandarpal
author
2y

2200 KW