Filter interviews by
Basic aptitude,c rogramming,object oriented programming
Top trending discussions
posted on 24 Apr 2024
I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.
Technical or aptitude
Plasma welding uses a high-temperature ionized gas to melt and join metals together.
Plasma welding involves creating an electrical arc between the workpiece and the electrode, ionizing the gas to form plasma.
The high temperature of the plasma melts the metals being welded together.
Plasma welding is commonly used for precision welding of thin materials or in applications where a high level of control is needed.
Examples ...
Brazing welding is a joining process where a filler metal is melted and distributed between two or more close-fitting parts by capillary action.
Brazing involves heating the base metals to a temperature above 450°C but below their melting point.
The filler metal, usually in the form of a wire or preformed shape, is then melted and flows into the joint by capillary action.
The filler metal must wet the base metals and form...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I applied via campus placement at Dr Navalar Nedunchezhiyan College of Engineering, Tholudur and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Aptitude test
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
The full repair breakdown rms refers to the detailed analysis of the repair process in a production environment.
The full repair breakdown includes a step-by-step breakdown of the repair process.
It provides information on the time taken for each step, the resources used, and any issues encountered.
The breakdown helps identify bottlenecks, inefficiencies, and areas for improvement in the repair process.
Examples of data c...
1.ac.2 repair.3demo.intalltiob
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Production related issues can include equipment breakdowns, supply chain disruptions, and quality control problems.
Equipment breakdowns can cause delays and halt production entirely.
Supply chain disruptions can lead to shortages of raw materials or finished products.
Quality control problems can result in defective products and damage to the company's reputation.
Other issues may include inefficient processes, safety haz...
This question is asking me to respond quickly and without hesitation.
I understand the importance of quick thinking in a production engineering role
I will take a moment to gather my thoughts before responding
I will provide a clear and concise answer to the best of my ability
I was interviewed in Aug 2024.
I applied via Naukri.com
7QC tools, 6S, 4M, 3R, Poka Yoke, Kaizen, CAPPA, PPM, UPH, and cycle time are all important concepts in production engineering.
7QC tools are quality control tools used to identify and solve production problems.
6S is a methodology for workplace organization and standardization.
4M stands for Man, Machine, Material, and Method and is used to identify the root cause of production problems.
3R stands for Reduce, Reuse, and R...
based on 1 interview
Interview experience
Staff Engineer
304
salaries
| ₹15 L/yr - ₹40 L/yr |
Principal Engineer
199
salaries
| ₹24.5 L/yr - ₹59 L/yr |
Senior Engineer
142
salaries
| ₹13.3 L/yr - ₹25.2 L/yr |
Test Engineer
131
salaries
| ₹3 L/yr - ₹8.2 L/yr |
Senior Software Engineer
74
salaries
| ₹10 L/yr - ₹25 L/yr |
Seagate
Micron Technology
Intel
Samsung