Filter interviews by
Printing matrix in spiral form and left+right view of tree
For matrix, use four pointers to traverse in spiral form
For tree, use recursion to traverse and print left and right view
For left view, print the first node encountered in each level
For right view, print the last node encountered in each level
Answering interview questions for software developer backend
For School class, define properties like name, location, students, teachers, etc.
For Instagram DB, define tables for users, posts, comments, likes, etc.
Use relational database management system like MySQL or PostgreSQL.
Implement proper indexing and normalization to optimize performance.
Ensure data security and privacy by implementing authentication and authori...
Lazy loading is a technique used to defer the loading of non-critical resources until they are actually needed.
It improves page load time and performance
It reduces the initial load time of a web page
It is commonly used for images, videos, and other media files
It can be implemented using JavaScript or server-side programming
Example: Images on a long-scrolling page are loaded only when they come into view
Top trending discussions
posted on 10 May 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 4 interview rounds.
posted on 30 Nov 2022
I applied via LinkedIn and was interviewed before Nov 2021. There were 3 interview rounds.
There are basic aptitude questions for freshers level
posted on 10 Feb 2022
Nothing
posted on 23 Nov 2022
posted on 16 Mar 2023
I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.
Java and python test was there
posted on 21 Dec 2024
I applied via Approached by Company and was interviewed before Dec 2023. There were 4 interview rounds.
2 sum program from Geeks for Geeks
Lazy loading delays loading of related data until it is specifically requested, while eager loading loads all related data upfront. N+1 problem occurs when lazy loading results in multiple additional queries being made.
Lazy loading is used to improve performance by only loading related data when needed
Eager loading loads all related data upfront to reduce the number of queries made
N+1 problem occurs in lazy loading whe...
posted on 28 Jan 2025
I appeared for an interview before Jan 2024.
posted on 16 Sep 2021
I appeared for an interview before Sep 2020.
Round duration - 70 Minutes
Round difficulty - Hard
Prateek is a kindergarten teacher with a mission to distribute candies to students based on their performance. Each student must get at least one candy, and if two s...
The task is to distribute candies to students based on their performance while minimizing the total candies distributed.
Create an array to store the minimum candies required for each student.
Iterate through the students' ratings array to determine the minimum candies needed based on the adjacent ratings.
Consider both left-to-right and right-to-left passes to ensure fair distribution.
Keep track of the total candies dist
You are given a sequence of numbers, ARR
. Your task is to return a sorted sequence of ARR
in non-descending order using the Merge Sort algorithm.
The Merge Sort...
Implement Merge Sort algorithm to sort a sequence of numbers in non-descending order.
Use Divide and Conquer approach to recursively divide the input array into two halves.
Merge the sorted halves to produce a completely sorted array.
Ensure the implementation handles the constraints specified in the problem statement.
Example: For input [3, 1, 4, 1, 5], the output should be [1, 1, 3, 4, 5].
Tip 1 : Practice Atleast 250 Questions
Tip 2 : Do atleast 2 projects
Tip 1 : Do not put false things on resume.
Tip 2 : Have some projects on resume.
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
General topics like mathe, English, social etc
Senior Software Engineer
77
salaries
| ₹13.8 L/yr - ₹40 L/yr |
Software Engineer
61
salaries
| ₹6.6 L/yr - ₹20.5 L/yr |
QA Engineer
21
salaries
| ₹7 L/yr - ₹16.4 L/yr |
Software Developer
16
salaries
| ₹11.6 L/yr - ₹20 L/yr |
Associate Software Engineer
16
salaries
| ₹5.2 L/yr - ₹10 L/yr |
Maxgen Technologies
Value Point Systems
JoulestoWatts Business Solutions
F1 Info Solutions and Services