  • Q1. I was asked about Plant startup and shutdown activities like cold, warm and hot startup.
  • Q2. I was asked about Interlocks and protections of boiler and turbine.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare thoroughly for power plant familiarization.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1) What do you know about the compressor ? 2) How Many different types of compressors are their ? 3) what do you mean by double acting compressors ? 4) what do you know about the siemens energy ?
  • Ans. 

    This interview is for the Shift Incharge Engineer position and the questions are related to compressors and Siemens Energy.

    • Compressor is a mechanical device that increases the pressure of a gas by reducing its volume.

    • There are two main types of compressors - positive displacement and dynamic.

    • Double acting compressors compress the gas on both sides of the piston.

    • Siemens Energy is a global energy company that provides pr...

  • Answered by AI
  • Q2. 1) Which compressor mainly dresser-rand manufacture-reciprocating or centrifugal? 2) Tell me something about your last year project and what is your role in it ?

Interview Preparation Tips

Interview preparation tips for other job seekers - 1) Answer each question confidentially(either you are fresher or experience candidate).
2)maintain your flow when you are speaking.it's not too much fast .
3)prepare basic questions like ,tell me about yourself,etc
4)keep smile on your face when you are answering.
**NEVER GIVE UP**

Utility Powertech Interview FAQs

What are the top questions asked in Utility Powertech Shift Operations Engineer interview?

Some of the top questions asked at the Utility Powertech Shift Operations Engineer interview -

  1. I was asked about Plant startup and shutdown activities like cold, warm and hot...read more
  2. I was asked about Interlocks and protections of boiler and turbi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 427 Interviews
Thermax Limited Interview Questions
4.2
 • 238 Interviews
ABB Interview Questions
4.1
 • 228 Interviews
Adani Power Interview Questions
3.9
 • 206 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
ReNew Interview Questions
4.2
 • 82 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all
Utility Powertech Shift Operations Engineer Salary
based on 5 salaries
₹3.2 L/yr - ₹5.6 L/yr
At par with the average Shift Operations Engineer Salary in India
View more details
Engineer
86 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Safety Officer
53 salaries
unlock blur

₹2.5 L/yr - ₹6.8 L/yr

Senior Engineer
44 salaries
unlock blur

₹4 L/yr - ₹7.1 L/yr

Electrical Engineer
41 salaries
unlock blur

₹2.8 L/yr - ₹6.5 L/yr

Mechanical Engineer
32 salaries
unlock blur

₹2.3 L/yr - ₹8.1 L/yr

Explore more salaries
Compare Utility Powertech with

BHEL

4.1
Compare

Thermax Limited

4.2
Compare

Siemens

4.1
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview