Upload Button Icon Add office photos

Utility Powertech

Compare button icon Compare button icon Compare

Filter interviews by

Utility Powertech ITI Electrician Interview Questions, Process, and Tips

Updated 6 Dec 2023

Utility Powertech ITI Electrician Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. FULL FORM OF MCB
  • Ans. 

    MCB stands for Miniature Circuit Breaker.

    • MCB is an electrical switch that automatically protects an electrical circuit from damage caused by overload or short circuit.

    • It is a type of circuit breaker that is commonly used in residential and commercial buildings.

    • MCBs are designed to trip and disconnect the circuit when excessive current flows through it, preventing damage to the electrical equipment and wiring.

    • They are c...

  • Answered by AI
  • Q2. What is a potential transformer?
  • Ans. 

    A potential transformer is a type of instrument transformer used to measure voltage in high voltage systems.

    • It is also known as a voltage transformer.

    • It steps down the voltage to a lower level suitable for measurement or protection.

    • Potential transformers are commonly used in power systems for metering, relaying, and control purposes.

    • They provide accurate voltage measurements and isolate the measuring instruments from h...

  • Answered by AI
  • Q3. How many windings are used in auto transformer?
  • Ans. 

    The number of windings used in an auto transformer can vary depending on the specific application.

    • Auto transformers can have a single winding or multiple windings.

    • In a single winding auto transformer, the primary and secondary windings are connected together.

    • In a multiple winding auto transformer, there are separate primary and secondary windings.

    • The number of windings determines the voltage transformation ratio of the...

  • Answered by AI
  • Q4. Full form of SWG ?
  • Ans. 

    SWG stands for Standard Wire Gauge.

    • SWG is a standardized system for measuring the diameter of wire.

    • It is commonly used in electrical and electronic industries.

    • SWG is also known as British Standard Wire Gauge (BSWG).

  • Answered by AI
  • Q5. By what is the speed of turbine controlled?
  • Ans. 

    The speed of a turbine is controlled by adjusting the flow of steam or water.

    • The speed of a turbine can be controlled by adjusting the flow rate of the working fluid, such as steam or water.

    • By increasing or decreasing the flow rate, the turbine's speed can be increased or decreased accordingly.

    • This control mechanism allows for efficient operation and optimization of power generation systems.

    • For example, in a steam turb...

  • Answered by AI
Round 3 - Coding Test 

ABC=123 EFG=567 STU=?

Interview Preparation Tips

Topics to prepare for Utility Powertech ITI Electrician interview:
  • Electricals
  • Power Transformers
  • Distribution
  • Motors
  • general

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why do want to join
  • Q2. Your long term goals
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease voltage levels in electrical circuits.

    • They consist of two coils of wire, known as the primary and secondary coils, wrapped around a core.

    • Step-up transformers increase voltage levels, while step-down transformers decrease voltage levels.

    • Transf...

  • Answered by AI
  • Q2. Electrical safety rule
Round 2 - HR 

(2 Questions)

  • Q1. Qualification is
  • Q2. Daital and place

Interview Preparation Tips

Interview preparation tips for other job seekers - What is advice electrical job is most important
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Electrical technician, LT or HT panel and motors. Transformers working or its Maintenance. House wiring and starter panel wiring.
  • Q2. Maintenance work in power plant
  • Ans. 

    Maintenance work in power plant involves regular inspections, repairs, and upgrades to ensure smooth operation and safety.

    • Regularly inspecting equipment for signs of wear and tear

    • Performing routine maintenance tasks such as lubricating moving parts

    • Repairing faulty equipment to prevent breakdowns

    • Upgrading systems to improve efficiency and safety

    • Following safety protocols to prevent accidents

    • Keeping detailed records of m

  • Answered by AI
  • Q3. All types of electrical equipment.
  • Ans. 

    All types of electrical equipment refer to a wide range of devices used for generating, transmitting, and distributing electricity.

    • Generators: devices that convert mechanical energy into electrical energy

    • Transformers: devices that change the voltage of electricity for transmission

    • Switchgear: equipment used to control, protect, and isolate electrical circuits

    • Cables and wires: used for transmitting electricity from one p...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Work releted questions
  • Q2. Other work experience
  • Q3. Your skills is best for company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be peaceful give answer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 5s, soler cell manufacturing
  • Q2. Kizene, 5s, sop, quality, dipartment process

Interview Preparation Tips

Interview preparation tips for other job seekers - Team leadership, time manegment and quality process

Interview Questionnaire 

1 Question

  • Q1. Transformer, motor & what is renewable energy sources
  • Ans. 

    Transformers and motors are devices used to convert and utilize electrical energy, while renewable energy sources are natural resources that can be replenished.

    • Transformers are devices that transfer electrical energy between two or more circuits through electromagnetic induction

    • Motors are devices that convert electrical energy into mechanical energy to perform work

    • Renewable energy sources are natural resources such as ...

  • Answered by AI

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Solar fild

Interview Preparation Tips

Interview preparation tips for other job seekers - Solar ground mounted
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is difference between earth and neutral ?
  • Ans. 

    Earth is the connection between an electrical circuit and the ground, while neutral is the return path for current in a circuit.

    • Earth is a safety measure to prevent electric shock and protect against electrical faults.

    • Neutral carries the current back to the source in a circuit.

    • Earth is typically connected to the ground through a grounding electrode.

    • Neutral is usually connected to the center tap of a transformer.

    • In a th...

  • Answered by AI

I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

About the T.B.T.& P.T.W.
About the Module, SCB, Cables ,Inverter, IDT ,HT-LT Panel ,ICOG Panel And Other Electrical Elements and all block successfully charged

Round 3 - Coding Test 

Cable colour coding
All panel wiring & wiring coding

Interview Preparation Tips

Topics to prepare for ReNew Technician interview:
  • Data Structures
  • PPC
  • All information about power plan
  • About the Module SCB Cables IDT
Interview preparation tips for other job seekers - Best Regards
Discipline
Dedication
Best performance

Utility Powertech Interview FAQs

How many rounds are there in Utility Powertech ITI Electrician interview?
Utility Powertech interview process usually has 3 rounds. The most common rounds in the Utility Powertech interview process are Resume Shortlist, Technical and Coding Test.
What are the top questions asked in Utility Powertech ITI Electrician interview?

Some of the top questions asked at the Utility Powertech ITI Electrician interview -

  1. By what is the speed of turbine controll...read more
  2. How many windings are used in auto transform...read more
  3. What is a potential transform...read more

Tell us how to improve this page.

Utility Powertech ITI Electrician Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 229 Interviews
ReNew Interview Questions
4.2
 • 89 Interviews
Vestas Interview Questions
4.3
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 81 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
Waaree Energies Interview Questions
3.9
 • 60 Interviews
Greenko Group Interview Questions
3.8
 • 49 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
View all

Utility Powertech ITI Electrician Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

2.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Engineer
74 salaries
unlock blur

₹3.1 L/yr - ₹7 L/yr

Safety Officer
52 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
44 salaries
unlock blur

₹4 L/yr - ₹7.1 L/yr

Electrical Engineer
42 salaries
unlock blur

₹2.8 L/yr - ₹6.5 L/yr

Mechanical Engineer
33 salaries
unlock blur

₹2.3 L/yr - ₹8.1 L/yr

Explore more salaries
Compare Utility Powertech with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview