A water system is a network of pipes, tanks, pumps, and valves used to supply water for various purposes.
Water source (e.g. reservoir, well)
Pipes for distribution
Pumps to move water
Valves to control flow
Water treatment facilities
Water storage tanks
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2020. There was 1 interview round.
VCB stands for Vacuum Circuit Breaker, which is an electrical switch that uses vacuum as the dielectric medium.
VCB is used to protect electrical equipment from damage caused by overcurrents and short circuits.
It is commonly used in high voltage power systems.
VCBs are more reliable and require less maintenance compared to other types of circuit breakers.
They are also more environmentally friendly as they do not use any ...
DG stands for Diesel Generator, which is a backup power source used in case of power outages.
DG is a standalone power source that runs on diesel fuel.
It is commonly used as a backup power source in case of power outages.
DGs are often used in hospitals, data centers, and other critical facilities to ensure uninterrupted power supply.
They come in various sizes and capacities, depending on the power requirements of the fa...
DC motors convert electrical energy into mechanical energy through the interaction of magnetic fields.
DC motors have a stationary part called the stator and a rotating part called the rotor.
The stator contains the field windings that produce a magnetic field, while the rotor has the armature windings that carry the current.
The interaction of the magnetic fields causes the rotor to rotate, producing mechanical energy.
DC...
PLC stands for Programmable Logic Controller, a digital computer used for automation of electromechanical processes.
PLCs are used in industrial automation to control machinery and processes
They are programmed using ladder logic or other programming languages
PLCs can communicate with other devices and systems through various communication protocols
Examples of PLC applications include manufacturing, transportation, and b
I appeared for an interview in Aug 2017.
Calibration is the process of adjusting or verifying the accuracy of a measuring instrument or device.
Calibration ensures that measurements taken by an instrument are accurate and reliable.
It involves comparing the measurements of a device to a known standard.
Calibration may involve adjusting the device to bring it in line with the standard.
It is important in various fields like engineering, manufacturing, and scientif...
Calibrating temperature indicators involves adjusting them to ensure accurate readings.
Calibration of temperature indicators involves comparing their readings to a known standard.
Adjustments are made to the indicators to align their readings with the standard.
Calibration may involve adjusting the zero point and span of the indicators.
Examples of temperature indicators include thermometers, temperature sensors, and temp
Calibration of RTDs involves comparing the sensor's output to a known reference and adjusting it accordingly.
RTDs (Resistance Temperature Detectors) are calibrated to ensure accurate temperature measurements.
Calibration involves comparing the RTD's resistance values at different temperatures to a known reference.
Adjustments are made to the RTD's output signal to align it with the reference values.
Calibration can be don...
There are several types of flow meters used in various industries to measure the flow rate of fluids or gases.
Some common types of flow meters include electromagnetic flow meters, ultrasonic flow meters, turbine flow meters, and positive displacement flow meters.
Electromagnetic flow meters use Faraday's law of electromagnetic induction to measure the flow rate of conductive fluids.
Ultrasonic flow meters utilize ultraso...
To check door interlock systems, inspect the physical components, test the electrical connections, and verify proper functioning.
Inspect the door hinges, latches, and locks for any damage or misalignment.
Check the wiring connections and ensure they are secure and not damaged.
Test the interlock switch by opening and closing the door to see if it activates properly.
Verify that the interlock system prevents the door from ...
To calibrate pressure gauges, vacuum gauges, and compound gauges, follow these steps:
Use a known reference pressure source to compare the readings of the gauges.
Adjust the gauges if there is any deviation from the reference pressure.
Repeat the process multiple times to ensure accuracy.
Document the calibration process and results for future reference.
Perform regular calibrations to maintain accuracy.
Example: For pressur...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Oct 2023. There was 1 interview round.
Assignment is given related to my previous experience that water system qualifications and HVAC maintenance
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
Simple math questions
based on 1 interview
Interview experience
Senior Executive
93
salaries
| ₹4.4 L/yr - ₹12.8 L/yr |
Executive
86
salaries
| ₹4.4 L/yr - ₹8.8 L/yr |
Senior Officer
85
salaries
| ₹3 L/yr - ₹6.4 L/yr |
Officer
55
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Assistant Manager
52
salaries
| ₹8.5 L/yr - ₹14.4 L/yr |
Hetero
Abbott
Micro Labs
GlaxoSmithKline Pharmaceuticals