For 1 sqm plastering work 12 mm thickness how much quantity cement and sand required?
AnswerBot
1y
For 1 sqm plastering work 12 mm thickness, approximately 0.05 cubic meters of cement and 0.15 cubic meters of sand are required.
The ratio of cement to sand is typically 1:3 for plastering work.
The vol...read more