Add office photos
Employer?
Claim Account for FREE

Technico Industries

3.6
based on 356 Reviews
Video summary
Filter interviews by

Litens Automotive Group Interview Questions and Answers

Updated 23 Sep 2024
Popular Designations

Q1. What is difference between MIS and MRM. Difference between QC,QA and TQM. What is a DPM , DPMO and PPM . Types of defect in Press shop and its counter measure. What is a base standard of IATF, EHS , OHASAS. Wha...

read more
Ans.

A set of questions related to quality engineering concepts and practices.

  • MIS (Management Information System) is a system that provides information to support decision-making in an organization, while MRM (Management Review Meeting) is a meeting where top management reviews the performance of the organization.

  • QC (Quality Control) is a process that ensures products or services meet specified requirements, QA (Quality Assurance) is a process that ensures the quality of the produ...read more

Add your answer

Q2. Problem in press parts how its occurs & prevention to stop these issue .

Ans.

Press parts problems can occur due to various reasons. Prevention measures include regular maintenance, proper training, and quality control.

  • Press parts problems can occur due to wear and tear, improper maintenance, or operator error.

  • Regular maintenance of the press machine and its parts can prevent issues from occurring.

  • Proper training of operators can ensure that they use the machine correctly and avoid mistakes.

  • Quality control measures can help identify and address any iss...read more

Add your answer

Q3. Manpower handling in some critical condition , how to stop them for complition of dispatch plan .

Ans.

To stop manpower from completing dispatch plan during critical conditions, prioritize safety and communicate effectively.

  • Ensure safety of workers and prioritize it over meeting deadlines

  • Communicate the critical situation to the workers and explain the risks involved

  • Provide necessary training and equipment to handle critical situations

  • Implement contingency plans to deal with emergencies

  • Monitor the situation closely and make necessary adjustments to the dispatch plan

  • Encourage w...read more

Add your answer

Q4. What is SPC and how it help

Ans.

SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are stable and in control.

  • SPC involves collecting and analyzing data to identify variations in a process.

  • It helps in detecting and eliminating special causes of variation to improve process performance.

  • Common tools used in SPC include control charts, histograms, and Pareto charts.

  • Example: Using control charts to monitor the weight of packaged products to ensure they are w...read more

Add your answer
Discover Litens Automotive Group interview dos and don'ts from real experiences

Q5. What are the tolerances ?

Ans.

Tolerances are the allowable variations in dimensions, properties, or performance of a product or process.

  • Tolerances are specified to ensure that a product or process meets its intended design and function.

  • They can be expressed as a range of values or as a maximum deviation from a specified value.

  • Tolerances can be applied to various aspects of a product or process, such as dimensions, material properties, and performance characteristics.

  • For example, a tolerance for the diamet...read more

Add your answer

Q6. Different type of msa

Ans.

Different types of Measurement System Analysis (MSA) include Gage R&R, Bias Study, Linearity Study, Stability Study, and Attribute Agreement Analysis.

  • Gage R&R: Evaluates the variation in measurement systems due to operators and equipment.

  • Bias Study: Assesses the accuracy of measurements by comparing them to a known standard.

  • Linearity Study: Determines if the measurement system provides consistent results across the full range of measurements.

  • Stability Study: Examines the cons...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Litens Automotive Group

based on 4 interviews
2 Interview rounds
Resume Shortlist Round
Technical Round
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Quality Engineer Interview Questions from Similar Companies

4.0
 • 16 Interview Questions
4.1
 • 15 Interview Questions
3.9
 • 14 Interview Questions
4.2
 • 13 Interview Questions
3.9
 • 11 Interview Questions
4.3
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter