Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
Reasoning and technical questions
Prevtion is better than cure
Will the electric vehicles beneficial for India
I was interviewed before May 2017.
I applied via Campus Placement and was interviewed before May 2019. There was 1 interview round.
posted on 30 Oct 2022
I applied via LinkedIn and was interviewed before Oct 2021. There were 2 interview rounds.
posted on 2 Sep 2021
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
posted on 25 Jun 2022
I applied via Approached by Company and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 4 Nov 2022
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
PPAP is a process for ensuring quality in manufacturing. Explaining customer complaints in Telegu.
PPAP stands for Production Part Approval Process
It is a standardized process used in the automotive industry to ensure quality in manufacturing
Customer complaints can be related to issues with the product or service provided
In Telegu, customer complaint can be translated as వినియోగదారు ఫిర్యాదు
Examples of customer complain...
posted on 15 Mar 2023
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 3 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
The minimum resistance input at Neutral+earth at telecom sites should be less than 1 ohm.
The minimum resistance input at Neutral+earth is typically required to be less than 1 ohm to ensure proper grounding and safety.
This low resistance helps to prevent electrical shocks and damage to equipment.
Regular testing and maintenance of the grounding system is important to ensure it meets safety standards.
Examples of equipment...
VRLA stands for Valve Regulated Lead Acid technology, a type of rechargeable battery commonly used in UPS systems and other applications.
VRLA batteries are maintenance-free and sealed, making them ideal for applications where regular maintenance is not feasible.
They use a gel or absorbent glass mat (AGM) to immobilize the electrolyte, preventing spills and allowing for operation in any orientation.
Common examples of VR...
To connect a 48V 300Ah battery bank to a 24V timing system, you can use a DC-DC converter or series-parallel connection.
Use a DC-DC converter to step down the voltage from 48V to 24V.
Connect the battery banks in series-parallel configuration to achieve the desired voltage and capacity.
Ensure proper wiring and safety measures are followed during the connection process.
posted on 28 Jul 2024
I am a recent graduate with a degree in Mechanical Engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in Mechanical Engineering
Passionate about problem-solving and innovation
Strong communication and teamwork skills
Experience with CAD software such as SolidWorks
Certain topic they given
Diploma Trainee Engineer
312
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
164
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Exide Industries
Amara Raja Energy & Mobility
HBL Power Systems
Su-Kam Power Systems