Filter interviews by
I applied via Naukri.com and was interviewed before Jul 2021. There were 3 interview rounds.
FIFO stands for First-In-First-Out. Kanban is a lean manufacturing system that uses visual cues to trigger action.
FIFO is a method of inventory management where the first item received is the first item to be used or sold.
Kanban is a system that uses visual signals to indicate when to produce or move items in a manufacturing process.
Kanban helps to reduce waste and improve efficiency by ensuring that production is alig...
Least count is the smallest value that can be measured by an instrument.
Least count is a measure of the precision of an instrument.
It is the smallest unit of measurement that can be detected by the instrument.
It determines the accuracy and resolution of the instrument.
For example, the least count of a ruler with millimeter markings is 1 mm.
In engineering, least count is important for ensuring accurate measurements and
Top trending discussions
posted on 23 Oct 2021
I applied via Campus Placement and was interviewed before Oct 2020. There were 3 interview rounds.
QC tools are used to ensure product quality. Types include statistical process control, Pareto charts, and fishbone diagrams.
Statistical process control
Pareto charts
Fishbone diagrams
Control charts
Histograms
Scatter diagrams
Check sheets
Flowcharts
Cause-and-effect diagrams
Problem solving techniques involve identifying the root cause of an issue and developing a plan to address it.
Gather information and data to fully understand the problem
Break down the problem into smaller, more manageable parts
Brainstorm potential solutions and evaluate their feasibility
Implement the chosen solution and monitor its effectiveness
Continuously assess and adjust the solution as needed
Troubleshooting CNC programming involves identifying and resolving errors in the code.
Check for syntax errors in the code
Verify that the correct tool paths are being used
Ensure that the machine is properly calibrated
Inspect the tooling for wear or damage
Monitor the machine during operation for any abnormalities
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
General aptitude test
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Assistant Manager
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
MAHLE Behr India
Modine Manufacturing
Subros
Valeo