Q1. What's civil engineering

Ans.

Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure.

  • Civil engineering involves the planning, design, and construction of buildings, roads, bridges, dams, and other structures.

  • It encompasses various sub-disciplines such as structural engineering, geotechnical engineering, transportation engineering, and water resources engineering.

  • Civil engineers use principles of physics, mathematics, and materials science t...read more

View 25 more answers

Q2. Minimum use dia of bar in column

Ans.

The minimum use diameter of bar in a column depends on various factors such as load, column size, and design requirements.

  • The minimum use diameter of bar in a column is determined by the structural engineer during the design phase.

  • It is influenced by the load that the column will bear and the size of the column.

  • The design requirements, such as the desired strength and durability of the column, also play a role in determining the minimum bar diameter.

  • The minimum use diameter o...read more

View 14 more answers

Q3. Define the work progress to timely complete target

Ans.

Work progress to timely complete target involves planning, monitoring, and adjusting activities to ensure timely completion.

  • Develop a detailed project schedule with clear milestones and deadlines

  • Regularly monitor and track progress against the schedule

  • Identify potential delays or issues and take proactive measures to address them

  • Allocate resources effectively to ensure tasks are completed on time

  • Regularly communicate with the project team to ensure everyone is aware of the pr...read more

View 3 more answers

Q4. Typ of grade concrite rrc slump value

Ans.

The slump value of grade concrete RRC varies depending on the specific requirements and application.

  • The slump value of grade concrete RRC is determined by the desired workability and consistency of the concrete mix.

  • Higher slump values indicate a more fluid and workable concrete mix, while lower slump values indicate a stiffer and less workable mix.

  • The slump value for grade concrete RRC can range from 25 mm to 100 mm or more, depending on the project specifications.

  • For example...read more

View 2 more answers
Discover Tridge interview dos and don'ts from real experiences

Q5. Diffrence one way slab and two way slab

Ans.

One-way slabs are supported on two opposite sides and transfer the load in one direction, while two-way slabs are supported on all four sides and transfer the load in two directions.

  • One-way slabs are designed to transfer the load primarily in one direction, either along the shorter span or the longer span.

  • Two-way slabs are designed to transfer the load in both directions, along both the shorter and longer spans.

  • One-way slabs are typically used for narrow spans or when the rat...read more

View 3 more answers

Q6. What are the standards used for plant layout in reference.

Ans.

Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.

  • OSHA regulations set guidelines for safety in plant layout design

  • Industry best practices ensure efficient use of space and resources

  • Client requirements may include specific equipment placement or workflow needs

Add your answer
Are these interview questions helpful?

Q7. What we do for shortage of material received.

Ans.

In case of shortage of material received, we can take the following actions:

  • Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.

  • Check if there are any alternative suppliers who can provide the required material.

  • Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.

  • Prioritize the use of available material for critical tasks and find ways to optimize its usage.

  • Implement ...read more

View 1 answer

Q8. What is role of site engineering in construction

Ans.

Site engineering plays a crucial role in construction by overseeing the planning, design, and execution of projects.

  • Site engineers are responsible for surveying the construction site and preparing detailed plans and layouts.

  • They collaborate with architects and contractors to ensure that the project meets all specifications and regulations.

  • Site engineers supervise the construction process, monitor progress, and resolve any issues that may arise.

  • They ensure that the project is ...read more

View 2 more answers
Share interview questions and help millions of jobseekers 🌟

Q9. What is safety equipment .use for site.

Ans.

Safety equipment is used on construction sites to protect workers from potential hazards and accidents.

  • Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves

  • Safety harnesses and fall protection systems for working at heights

  • Earplugs or earmuffs to protect against loud noises

  • Respirators or masks for protection against dust, fumes, or hazardous substances

  • Safety signs and barricades to warn and control access to hazardous areas

  • Fire extinguishers and fi...read more

View 1 answer

Q10. What is detailed of site execution.

Ans.

Site execution involves the implementation of construction plans and managing the construction process on-site.

  • Site execution includes activities such as earthwork, foundation construction, structural work, and finishing work.

  • It involves coordinating with various stakeholders, including architects, contractors, and suppliers.

  • Ensuring compliance with building codes, safety regulations, and quality standards is crucial during site execution.

  • Monitoring progress, resolving issues...read more

Add your answer

Q11. BBS Billing Quality

Ans.

BBS Billing Quality is crucial for accurate project cost estimation and tracking.

  • BBS (Bar Bending Schedule) should be accurate and detailed to ensure correct quantity take-offs.

  • Quality control measures should be in place to verify the accuracy of BBS.

  • Regular audits and checks should be conducted to ensure billing quality.

  • Inaccurate BBS can lead to cost overruns and delays in project completion.

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Civil Site Engineer Interview Questions from Similar Companies

4.0
 • 30 Interview Questions
4.0
 • 26 Interview Questions
4.0
 • 20 Interview Questions
4.0
 • 10 Interview Questions
4.7
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter