Upload Button Icon Add office photos

Filter interviews by

Tata Hitachi Construction Machinery Production Supervisor Interview Questions and Answers

Updated 23 Mar 2022

Tata Hitachi Construction Machinery Production Supervisor Interview Experiences

1 interview found

I appeared for an interview in Feb 2022.

Round 1 - HR 

(8 Questions)

  • Q1. Tell me about yourself.
  • Q2. Why are you looking for a change?
  • Q3. Why should we hire you?
  • Q4. Share details of your previous job.
  • Q5. What are your strengths and weaknesses?
  • Q6. What are your salary expectations?
  • Q7. What is your family background?
  • Q8. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Honest ..smartly speak and actively work...daily working attendance.etc

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is u r role in old comapny
  • Q2. Why did you change your company
  • Q3. What is strength's do you have
  • Q4. Basic questions about GD&T

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and perform well

Production Engineer Interview Questions & Answers

Forbes Marshall user image Pratiksha Jitendra Deshmane

posted on 2 Aug 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Gk and all questions related to to mechanical

Round 2 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. What work are you special in?
  • Ans. 

    I specialize in optimizing production processes, implementing cost-saving measures, and improving overall efficiency.

    • Optimizing production processes to increase output

    • Implementing cost-saving measures to reduce expenses

    • Improving overall efficiency to enhance productivity

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. About fmea, pcp, pfd

I applied via AmbitionBox and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Introduce yourself?
  • Ans. Frist of thank you for giving me this opportunity to introduce myself. I am Komal dahale from mechanical engineering B-TECH Student basically from Maharashtrat nanded .graduate from Shri guru gobind sighji ji institute of engineering and technology Vishanupuri nanded..
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test

I applied via Company Website

Interview Questionnaire 

4 Questions

  • Q1. Tell me about yourself?
  • Q2. Production ,quality related questions
  • Q3. Production Related
  • Q4. Quality related

Interview Preparation Tips

Interview preparation tips for other job seekers - No

I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Knowledge about belt calibration,coal blanding ,DE system
Round 2 - Technical 

(1 Question)

  • Q1. Belt calibration,coal blanding, DE system

I applied via Approached by Company and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Coal yard management Coal blanding. .
  • Q2. Technical data about conveyor,Crusher ,VGF Wagon tippler Stacker cum Reclaimer Coal PV

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve tecnical deta as per your according experience and role and responsibilities.

Interview Questionnaire 

1 Question

  • Q1. Bases on previous experience
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Need minimum degree qualification in textile
Round 2 - HR 

(1 Question)

  • Q1. How long travel with TUV SUD
  • Ans. 

    My travel experience with TUV SUD has been extensive, focusing on various projects and client engagements across different regions.

    • Traveled to multiple countries for client audits, including Germany and the USA.

    • Participated in training sessions in Asia to enhance team skills.

    • Attended industry conferences in Europe to stay updated on regulations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need minimum degree qualification in textile

Tata Hitachi Construction Machinery Interview FAQs

How many rounds are there in Tata Hitachi Construction Machinery Production Supervisor interview?
Tata Hitachi Construction Machinery interview process usually has 1 rounds. The most common rounds in the Tata Hitachi Construction Machinery interview process are HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

TechnipFMC Interview Questions
4.0
 • 73 Interviews
TÜV SÜD Interview Questions
3.9
 • 65 Interviews
Hilti Interview Questions
3.5
 • 61 Interviews
TKIL Interview Questions
4.2
 • 59 Interviews
Forbes Marshall Interview Questions
4.1
 • 42 Interviews
Gmmco Interview Questions
4.1
 • 41 Interviews
View all

Tata Hitachi Construction Machinery Production Supervisor Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

4.7

Work-life balance

1.8

Salary

5.0

Job security

4.8

Company culture

4.8

Promotions

4.7

Work satisfaction

Explore 3 Reviews and Ratings
Service Engineer
139 salaries
unlock blur

₹1 L/yr - ₹6.9 L/yr

Assistant Manager
115 salaries
unlock blur

₹6 L/yr - ₹14.5 L/yr

Manager
106 salaries
unlock blur

₹7 L/yr - ₹15 L/yr

Senior Manager
106 salaries
unlock blur

₹10 L/yr - ₹23.1 L/yr

Assistant Divisional Manager
81 salaries
unlock blur

₹14.5 L/yr - ₹24 L/yr

Explore more salaries
Compare Tata Hitachi Construction Machinery with

Sigma Electric Manufacturing Corporation

4.0
Compare

TÜV SÜD

3.9
Compare

TKIL

4.2
Compare

Ceasefire Industries

3.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview