Suroj Buildcon
Universal Corporation Interview Questions and Answers
Q1. How many experience construction site supervision
I have 10 years of experience in construction site supervision.
I have supervised construction sites for 10 years
Managed teams of workers and subcontractors
Ensured compliance with safety regulations and project timelines
Implemented quality control measures to maintain high standards
Resolved any issues or conflicts that arose on site
Q2. Project bar chart used
A project bar chart is a visual representation of project tasks and their timelines.
Project bar charts show tasks as bars with lengths representing their duration
They help in visualizing project timelines and dependencies
Commonly used in project management software like Microsoft Project or Asana
Q3. Work of Autocad in civil engineering
AutoCAD is a software used in civil engineering for creating and editing 2D and 3D designs of buildings, infrastructure, and construction projects.
AutoCAD is used for drafting and designing architectural plans, structural layouts, and electrical and plumbing systems.
It allows civil engineers to create accurate and detailed drawings, including floor plans, elevations, sections, and site plans.
AutoCAD enables engineers to analyze and simulate the behavior of structures, perform...read more
Q4. Which IS code is following for mix design, cube test, slump test etc.
IS code 10262 is followed for mix design, IS code 516 for cube test, IS code 1199 for slump test.
Mix design follows IS code 10262
Cube test follows IS code 516
Slump test follows IS code 1199
Q5. What is the difference between layouts and stake out
Layouts involve planning and designing the physical arrangement of structures, while stake out involves physically marking the positions of these structures on the ground.
Layouts refer to the process of planning and designing the physical arrangement of structures, such as buildings, roads, or utilities.
Stake out involves physically marking the positions of these structures on the ground based on the layout plans.
Layouts are typically done using software tools like AutoCAD or...read more
Q6. Rules and planning of events create
Rules and planning of events create structure and organization.
Rules ensure that everyone follows the same guidelines and expectations.
Planning helps to ensure that events run smoothly and efficiently.
Structure and organization are important for successful events.
Examples include creating a detailed schedule, assigning roles and responsibilities, and setting clear expectations for attendees.
Q7. Ratio of m20 concrete
The ratio of M20 concrete is 1:1.5:3.
The ratio of M20 concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M20 grade concrete, the ratio is 1 part cement, 1.5 parts sand, and 3 parts aggregate.
This ratio is commonly used for general construction purposes.
Example: For 1 cubic meter of M20 concrete, you would need 1 part cement (cubic meter), 1.5 parts sand (1.5 cubic meters), and 3 parts aggregate (3 cubic meters).
Q8. Management of labour
Management of labour involves planning, organizing, directing and controlling the workforce to achieve organizational goals.
Labour management includes recruitment, training, performance evaluation, and compensation.
Effective communication and conflict resolution are crucial for successful labour management.
Labour laws and regulations must be followed to ensure fair treatment of employees.
Examples of labour management strategies include job sharing, flexible work arrangements,...read more
Q9. You Know contractor billing.
Yes, I am familiar with contractor billing processes.
Understanding of contract terms and conditions
Reviewing contractor invoices for accuracy
Processing payments in accordance with contract terms
Resolving any billing discrepancies
Maintaining detailed records of contractor billing
Interview Process at Universal Corporation
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month