Filter interviews by
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
Peak factor is the ratio of the peak value of a signal to its RMS value.
Peak factor is used to measure the peak-to-average ratio of a signal.
It is calculated by dividing the peak value of a signal by its RMS value.
A higher peak factor indicates a signal with larger peaks and greater dynamic range.
For example, a sine wave with no distortion has a peak factor of √2 or approximately 1.414.
Sewer gems are tools used in network engineering for monitoring and troubleshooting network performance in complex systems.
Sewer gems are specialized software or hardware tools used by network engineers.
They help in monitoring and analyzing network traffic, identifying bottlenecks, and troubleshooting issues.
Examples of sewer gems include Wireshark, SolarWinds Network Performance Monitor, and Cisco Network Assistant.
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.
Technical plus general knowledge appti
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Developed a unique algorithm to optimize data processing in a large-scale distributed system.
Identified a bottleneck in the system's data processing pipeline
Implemented a parallel processing approach to distribute the workload across multiple nodes
Utilized a combination of caching and pre-processing techniques to reduce computational overhead
Achieved a significant improvement in overall system performance and reduced p
Yes
Yes, I have received constructive criticism on my work assignments.
I always view constructive criticism as an opportunity for growth and improvement.
I actively listen to the feedback provided and take notes to ensure I understand the areas that need improvement.
I analyze the criticism objectively and identify areas where I can make adjustments or implement changes.
I seek clarification if needed and ask for specific ...
I have extensive experience interfacing with clients both directly and indirectly.
I have worked as a Senior Engineer for the past five years, where I have regularly interacted with clients.
I have directly communicated with clients to gather requirements, provide updates, and address any concerns or issues.
I have also indirectly interfaced with clients through project managers and business analysts, ensuring their needs...
Yes, I have experience dealing with treatment plant equipment such as screens, grit, macerator, and sludge handling equipment.
I have worked on various projects involving the installation and maintenance of treatment plant equipment.
I am familiar with the operation and troubleshooting of screens used for removing large debris from wastewater.
I have experience with grit removal systems that separate sand, gravel, and oth...
Yes
Implemented a new Agile methodology to improve team productivity
Introduced a knowledge sharing platform to encourage continuous learning
Implemented a mentorship program to foster professional growth
Introduced automated testing tools to improve software quality
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
I was interviewed in May 2023.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Project Controller
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Accounting Assistant
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Civil Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Accounting Analyst
13
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
ARCADIS