10+ Punjab Fusion Interview Questions and Answers

Updated 10 Sep 2024

Q1. Full form of FHTC, specifications od hdpe and di pipes, wall thickness of water retaining structure.

Ans.

The full form of FHTC is not clear. HDPE pipes have high strength and flexibility, while DI pipes are more durable. Wall thickness of water retaining structure depends on the design and load requirements.

  • FHTC full form is not clear

  • HDPE pipes have high strength and flexibility, making them suitable for underground installations and areas with high seismic activity

  • DI pipes are more durable and have a longer lifespan, making them suitable for above-ground installations and areas...read more

View 1 answer

Q2. Field experience in water supply works like construction of OHTs, MS DI HDPE Pipe laying, HSCs Intake head works Jackwel.

Ans.

I have extensive field experience in water supply works including construction of OHTs, MS DI HDPE Pipe laying, HSCs Intake head works Jackwel.

  • Experience in constructing Overhead Tanks (OHTs) for water storage

  • Expertise in laying MS DI HDPE pipes for water supply

  • Proficient in constructing Head Works Jackwel for water intake

  • Skilled in constructing High Service Reservoirs (HSCs) for water storage

Add your answer

Q3. Minimum required Sbc for raft foundation design of ohsr

Ans.

The minimum required Sbc for raft foundation design of OHSR depends on various factors.

  • The size and weight of the OHSR

  • The soil type and bearing capacity

  • The depth of the foundation

  • The seismic zone of the location

  • Consulting a geotechnical engineer is recommended

Add your answer

Q4. Code of practice used for water retaining structures.

Ans.

The code of practice used for water retaining structures is BS EN 1992-3:2006.

  • BS EN 1992-3:2006 is the European standard for the design of concrete structures.

  • It provides guidelines for the design, construction, and maintenance of water retaining structures.

  • The code covers various types of water retaining structures such as reservoirs, tanks, and swimming pools.

  • It includes requirements for materials, structural design, durability, and safety.

  • The code also provides guidance on...read more

Add your answer
Discover Punjab Fusion interview dos and don'ts from real experiences

Q5. Design specification of oshr

Ans.

OSHR design specification includes hardware and software requirements for the system.

  • Hardware requirements such as processor, memory, storage, and input/output devices.

  • Software requirements such as operating system, programming languages, and development tools.

  • Functional requirements such as user interface, data storage, and security features.

  • Non-functional requirements such as performance, reliability, and scalability.

  • Example: OSHR design specification may require a minimum ...read more

Add your answer

Q6. do you know about fidic?

Ans.

FIDIC stands for International Federation of Consulting Engineers, which publishes standard contracts for the construction industry.

  • FIDIC is an acronym for International Federation of Consulting Engineers.

  • FIDIC publishes standard contracts for the construction industry.

  • FIDIC contracts are commonly used in international construction projects.

Add your answer
Are these interview questions helpful?

Q7. Coefficient of cement

Ans.

The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

  • The coefficient of cement is also known as the coefficient of thermal expansion.

  • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

  • The coefficient of cement varies depending on the type and composition of the cement.

  • For example, Portland cement typically has a coefficient of thermal expansion of around 10...read more

Add your answer

Q8. what is a BOQ?

Ans.

A BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.

  • A BOQ is typically prepared by a quantity surveyor or estimator.

  • It includes detailed information on quantities, unit rates, and total costs for each item in the project.

  • BOQs are used to help contractors and clients understand the scope of work and costs involved in a project.

  • Example: A BOQ for a building project would list the qua...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. what is a contract?

Ans.

A contract is a legally binding agreement between two or more parties that outlines the terms and conditions of their relationship.

  • A contract must involve an offer, acceptance, consideration, and intention to create legal relations.

  • Contracts can be written or oral, but written contracts are generally more enforceable.

  • Examples of contracts include employment agreements, rental agreements, and sales contracts.

Add your answer

Q10. Escalation of materials

Ans.

Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

  • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

  • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

  • Escalation can impact project timelines and budgets, so it is important to have a plan i...read more

Add your answer

Q11. What ur strength

Ans.

My strength lies in my ability to efficiently manage financial data and utilize computer software to streamline accounting processes.

  • Strong analytical and problem-solving skills

  • Proficient in using accounting software such as QuickBooks and Excel

  • Attention to detail and accuracy in financial record-keeping

  • Ability to multitask and prioritize tasks effectively

  • Excellent communication and teamwork skills

  • Adaptability to learn and adapt to new technologies and software

  • Experience in g...read more

Add your answer

Q12. What isLeave per month

Ans.

Leave per month varies depending on the organization's policies and regulations.

  • Leave per month is typically granted to employees for personal, sick, or vacation days.

  • The number of leave days can vary based on seniority, position, and company policies.

  • Some organizations may offer additional leave for special circumstances like maternity or paternity leave.

  • Employees may need to follow a specific process to request and be granted leave.

  • Unused leave days may or may not carry ove...read more

Add your answer

More about working at SMEC

HQ - North Sydney, New South Wales, Australia
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Punjab Fusion

based on 26 interviews
Interview experience
4.2
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.4
 • 490 Interview Questions
3.6
 • 232 Interview Questions
3.2
 • 162 Interview Questions
4.1
 • 155 Interview Questions
4.2
 • 146 Interview Questions
4.6
 • 145 Interview Questions
View all
Top SMEC Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter