I applied via Recruitment Consulltant and was interviewed in May 2022. There were 4 interview rounds.
Basic questions on technical knowledge.
MRP stands for Material Requirements Planning. It is a system used for production planning and inventory control.
MRP helps in determining the quantity and timing of raw materials required for production.
It ensures that the right materials are available at the right time to avoid stockouts or excess inventory.
MRP is used in manufacturing industries such as automotive, electronics, and food processing.
It helps in optimiz...
Yes, BOM stands for Bill of Materials and it is used in SAP for managing product structures.
BOM is a list of components and raw materials required to manufacture a product
It helps in planning and scheduling production
T-code for BOM is CS01 for creating a BOM and CS02 for changing it
Top trending discussions
I applied via Approached by Company and was interviewed before Dec 2016. There was 0 interview round.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
Logical reasoning and general math calculations case study
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
I applied via LinkedIn and was interviewed in Sep 2021. There were 2 interview rounds.
Aptitude mandatory
I applied via Walk-in
based on 2 reviews
Rating in categories
Design and Sales Specialist
170
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Business Development Manager
89
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Operations Specialist
65
salaries
| ₹2.8 L/yr - ₹6.1 L/yr |
Interior Designer
59
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Business Development Executive
48
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Nilkamal
Kurlon
Greenlam Industries
Wakefit