Filter interviews by
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 4 interview rounds.
The power plant process involves converting fuel into electricity through various stages.
Fuel is burned to produce heat
Heat is used to create steam
Steam turns a turbine
Turbine generates electricity
Electricity is sent to the grid for distribution
posted on 20 Feb 2021
I applied via Approached by Company and was interviewed in Dec 2018. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.
30 mins, basic engineering questions
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.
It uses statistical analysis to identify and eliminate sources of variation in a process.
The methodology follows a structured approach called DMAIC (Define, Measure, Analyze, Improve, Control).
Six Sigma is widely used...
Fishbone diagram is a visual tool used to identify the possible causes of a problem or an effect.
Also known as Ishikawa diagram or cause-and-effect diagram
Consists of a central spine and branches that represent different categories of potential causes
Used in quality control, process improvement, and problem-solving
Example: A fishbone diagram can be used to identify the possible causes of defects in a manufacturing proc
Individual Components Machine Process Time To Get Cycle Time .
To Delivered Components With SCM Time Study.
To Achieve Cycle Time < Takt Time Individual
Process Step.
Cycle Time is greater than Takt Time.
Cycle Time is the total time taken to complete a process or task.
Takt Time is the available time to complete a process or task.
If Cycle Time is less than Takt Time, it means the process is taking longer than the available time.
This can lead to inefficiencies, delays, and potential bottlenecks in the workflow.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Engineer
54
salaries
| ₹2.5 L/yr - ₹5.1 L/yr |
Assistant Manager
52
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Senior Engineer
51
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Engineer
51
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Electrical Engineer
29
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Thermax Limited
ABB
Tractors and Farm Equipment
Isgec Heavy Engineering