Labour cost per ton is a key metric used to evaluate the efficiency of labor utilization in production.
Calculate total labor cost for a specific period and divide by the total production output in tons for the same period.
Labor cost per ton = Total labor cost / Total production output in tons
For example, if the total labor cost for a month is $10,000 and the total production output is 1,000 tons, then the labor cost pe
Boiler capacity should be calculated based on the steam requirement of the plant.
Calculate the total steam requirement of the plant in kg/hr or lbs/hr.
Consider factors such as peak demand, standby requirements, and safety margins.
Select a boiler with a capacity that meets or exceeds the calculated steam requirement.
Consult with a boiler engineer or specialist for accurate sizing.
Example: If the plant requires 10,000 kg...
Top trending discussions
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Procurment input and output
Accountant
19
salaries
| ₹1 L/yr - ₹2.8 L/yr |
Executive Accountant
17
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Supervisor
11
salaries
| ₹0.8 L/yr - ₹1.8 L/yr |
Store Incharge
5
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Sales Executive
5
salaries
| ₹1 L/yr - ₹2.9 L/yr |
Venky's
Suguna Foods
Godrej Agrovet
Avanti Feeds