I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Top trending discussions
posted on 8 Jul 2022
To gland cable and connect instrument cables, follow proper cable routing and termination techniques.
Select the appropriate cable gland size and type for the cable being installed
Ensure the cable is properly routed and secured to prevent damage or strain on the connections
Strip the cable insulation to the appropriate length and prepare the conductors for termination
Connect the conductors to the appropriate terminals on...
Yes, location drawing is a detailed plan or map that shows the exact location of electrical and instrumentation equipment.
Location drawing is used to identify the exact location of electrical and instrumentation equipment in a facility.
It helps in maintenance and troubleshooting of equipment.
Location drawing includes details such as equipment tag numbers, cable routing, and junction box locations.
It is important for sa...
Cable tray fabrication in existing gas plant involves careful planning and execution.
Determine the required cable tray size and material
Identify the location and route of the cable tray
Ensure proper support and grounding of the cable tray
Fabricate the cable tray according to industry standards and specifications
Install the cable tray and secure it in place
Test the cable tray for functionality and safety
The process of pulling electrical cables involves planning, preparation, and execution.
Plan the route and determine the cable length needed
Prepare the cable by attaching pulling grips and lubrication
Use a cable puller to pull the cable through conduit or trays
Terminate the cable at both ends and test for continuity
Document the installation for future reference
Safety at work refers to the measures taken to prevent accidents, injuries, and illnesses in the workplace.
Safety protocols and procedures should be established and followed by all employees.
Regular safety inspections and audits should be conducted to identify and address potential hazards.
Personal protective equipment (PPE) should be provided and used when necessary.
Training and education on safety practices should be...
Permit to work is a formal written system used to control high-risk activities.
It is a safety procedure used in industries such as oil and gas, construction, and manufacturing.
It involves obtaining permission from a supervisor or manager before starting a high-risk activity.
The permit outlines the specific steps and precautions that must be taken to ensure the safety of workers and the environment.
Examples of high-risk...
posted on 24 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
Configuration of instruments involves setting up and adjusting instruments for optimal performance.
Configuration involves selecting appropriate measurement ranges and units.
Calibration of instruments is necessary to ensure accuracy.
Proper wiring and connection of instruments is crucial.
Configuration may also involve programming of instruments for specific tasks.
Regular maintenance and troubleshooting is important to en
Calibration of instruments is a crucial process to ensure accurate and reliable measurements.
Calibration involves comparing the readings of an instrument to a known standard.
Adjustments are made to the instrument to bring it into alignment with the standard.
Calibration should be performed regularly to maintain accuracy.
Documentation of calibration procedures and results is important for quality control and compliance.
E...
posted on 26 Feb 2021
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Mechanical Engineer
50
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Electrical Engineer
26
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Civil Engineer
23
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Instrumentation Technician
21
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Mechanical Technician
19
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
Shapoorji Pallonji Group