Add office photos
Sami-Sabinsa Group  logo
Employer?
Claim Account for FREE

Sami-Sabinsa Group

2.9
based on 174 Reviews
Filter interviews by
Designation
Experienced

10+ Sami-Sabinsa Group Interview Questions and Answers

Updated 26 Jan 2025

Q1. What is boiler efficiency, and what methods can be employed to improve it specifically in wood boilers?

Ans.

Boiler efficiency is a measure of how effectively a boiler converts fuel into heat energy. Improving efficiency in wood boilers can be achieved through proper maintenance, insulation, and combustion optimization.

  • Boiler efficiency is calculated by dividing the heat output by the heat input and multiplying by 100 to get a percentage.

  • To improve efficiency in wood boilers, regular cleaning and maintenance of the boiler and heat exchanger are essential.

  • Insulating the boiler and pi...read more

Add your answer
right arrow

Q2. What are the different types of water chillers and what design considerations should be taken into account?

Ans.

Water chillers come in various types such as air-cooled, water-cooled, and evaporative chillers, each with specific design considerations.

  • Air-cooled chillers use air to remove heat from the refrigerant, making them suitable for outdoor installation but less efficient than water-cooled chillers.

  • Water-cooled chillers use water to remove heat from the refrigerant, offering higher efficiency but requiring access to a water source for operation.

  • Evaporative chillers combine water e...read more

Add your answer
right arrow

Q3. What are the design considerations for a condenser intended for a reactor with a 10 KL capacity?

Ans.

Design considerations for a condenser for a 10 KL reactor

  • Consider the material of construction to withstand the corrosive nature of the reactor contents

  • Size the condenser appropriately to handle the heat load from the reactor

  • Ensure proper insulation to maintain temperature control

  • Include safety features such as pressure relief valves

  • Consider ease of maintenance and accessibility for cleaning and repairs

Add your answer
right arrow

Q4. What is calibration, and why is it necessary in the pharmaceutical industry?

Ans.

Calibration is the process of comparing measurements of an instrument or device to a known standard to ensure accuracy.

  • Calibration involves adjusting the instrument or device to align with the standard.

  • It is necessary in the pharmaceutical industry to ensure that equipment used in production and testing processes provides accurate and reliable results.

  • Calibration helps maintain quality control, compliance with regulations, and ultimately ensures the safety and efficacy of pha...read more

Add your answer
right arrow
Discover Sami-Sabinsa Group interview dos and don'ts from real experiences

Q5. What are the performance parameters of a cooling tower?

Ans.

Performance parameters of a cooling tower include approach, range, cooling capacity, efficiency, and water flow rate.

  • Approach: temperature difference between the cold water inlet and the wet-bulb temperature of the air

  • Range: temperature difference between the hot water outlet and the cold water inlet

  • Cooling capacity: amount of heat that can be removed by the cooling tower

  • Efficiency: ratio of actual heat transfer to the maximum possible heat transfer

  • Water flow rate: volume of ...read more

Add your answer
right arrow

Q6. What are the different types of reactors and their applications?

Ans.

Different types of reactors include batch reactors, continuous stirred-tank reactors, plug flow reactors, and fluidized bed reactors.

  • Batch reactors are used for small-scale production and testing.

  • Continuous stirred-tank reactors are commonly used in industrial processes for their efficient mixing capabilities.

  • Plug flow reactors are ideal for reactions that require uniform conditions throughout the reactor.

  • Fluidized bed reactors are used for gas-solid or liquid-solid reactions...read more

Add your answer
right arrow
Are these interview questions helpful?

Q7. What are preventive maintenance and breakdown maintenance?

Ans.

Preventive maintenance involves regular inspections and maintenance to prevent breakdowns, while breakdown maintenance is performed after a machine or equipment has already failed.

  • Preventive maintenance is scheduled and planned in advance to avoid unexpected breakdowns.

  • Breakdown maintenance is reactive and performed after a machine has already failed.

  • Examples of preventive maintenance include regular oil changes for vehicles and routine equipment inspections.

  • Examples of break...read more

Add your answer
right arrow

Q8. What are the different types of maintenance?

Ans.

The different types of maintenance include preventive maintenance, corrective maintenance, predictive maintenance, and proactive maintenance.

  • Preventive maintenance involves regularly scheduled inspections and maintenance to prevent breakdowns.

  • Corrective maintenance is performed after a failure occurs to restore equipment to working condition.

  • Predictive maintenance uses data and analytics to predict when maintenance should be performed based on the condition of the equipment.

  • P...read more

Add your answer
right arrow
Share interview questions and help millions of jobseekers 🌟
man with laptop

Q9. HARPC AND PCQI brief and process.

Ans.

HARPC and PCQI are food safety regulations in the US.

  • HARPC stands for Hazard Analysis and Risk-Based Preventive Controls. It requires food facilities to identify and address potential hazards.

  • PCQI stands for Preventive Controls Qualified Individual. It is a certification for individuals responsible for developing and implementing food safety plans.

  • Both HARPC and PCQI are requirements under the Food Safety Modernization Act (FSMA) in the United States.

Add your answer
right arrow

Q10. Process of obtaining land from Kiadb

Ans.

The process of obtaining land from KIADB involves several steps and requires adherence to legal and regulatory requirements.

  • Identify the land required and its purpose

  • Submit an application to KIADB with necessary documents

  • KIADB will conduct a site inspection and assess the land value

  • Negotiate the price and terms of the land acquisition

  • Sign an agreement and pay the required fees

  • Obtain necessary approvals and clearances from relevant authorities

  • Complete the registration process ...read more

Add your answer
right arrow

Q11. Brief on USFDA audit and its process

Ans.

USFDA audit is a regulatory inspection conducted by the US Food and Drug Administration to ensure compliance with regulations and standards.

  • USFDA audits are conducted to assess compliance with Good Manufacturing Practices (GMP) and other regulations.

  • The audit process typically involves pre-announcement, on-site inspection, documentation review, and issuance of a Form 483 with observations.

  • Companies are expected to respond to Form 483 observations with corrective and preventiv...read more

Add your answer
right arrow

Q12. How obtain NoC from PcB

Ans.

NoC can be obtained from PcB by following the necessary procedures and submitting the required documents.

  • Contact the relevant department or authority to obtain the necessary forms and guidelines.

  • Fill out the forms and provide all the required information and documents.

  • Submit the forms and wait for the approval process to be completed.

  • Once approved, the NoC will be issued and can be collected from the relevant department or authority.

Add your answer
right arrow

Q13. Software inowledge

Ans.

Software knowledge is essential for an Accounts Executive to effectively manage financial data and reports.

  • Proficiency in accounting software such as QuickBooks or SAP is important

  • Understanding of Microsoft Excel for data analysis and reporting

  • Knowledge of ERP systems for integrated financial management

  • Familiarity with CRM software for customer relationship management

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Sami-Sabinsa Group

based on 19 interviews
Interview experience
4.1
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Reliance Retail Logo
3.9
 • 497 Interview Questions
Mahindra & Mahindra Logo
4.1
 • 401 Interview Questions
Episource Logo
3.9
 • 209 Interview Questions
iEnergizer Logo
4.6
 • 159 Interview Questions
MRF Tyres Logo
3.7
 • 139 Interview Questions
View all
Recently Viewed
LIST OF COMPANIES
IG Petrochemicals
Locations
SALARIES
CNH Industrial
SALARIES
Ribbon Communication
INTERVIEWS
Uber
No Interviews
JOBS
Hitachi
No Jobs
INTERVIEWS
Cummins
No Interviews
SALARIES
Sami-Sabinsa Group
INTERVIEWS
Sami-Sabinsa Group
No Interviews
SALARIES
Ribbon Communication
INTERVIEWS
IG Petrochemicals
No Interviews
Top Sami-Sabinsa Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter