Upload Button Icon Add office photos

Filter interviews by

Rucha Group Of Industries PPC Engineer Interview Questions and Answers

Updated 12 Jul 2022

Rucha Group Of Industries PPC Engineer Interview Experiences

1 interview found

PPC Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Jul 2022

I applied via Campus Placement and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What do you know about this company
  • Q2. How what are elements in a metal
  • Ans. 

    Elements in a metal are the atoms that make up the metal and determine its properties.

    • Metals are made up of a lattice of metal atoms.

    • The properties of a metal are determined by the type of metal atoms and their arrangement in the lattice.

    • Metals can have different crystal structures depending on the arrangement of atoms.

    • Alloys are made by combining different metal atoms to create new properties.

    • The number of valence ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep you basic knowledge about machine used in industry and the basis applications such as welding and it's type, give introduction confidently

Interview questions from similar companies

I was interviewed in Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basics of PPC, planning, basics of welding
Round 3 - Aptitude Test 

Basic apptitude and reasoning questions

Round 4 - HR 

(1 Question)

  • Q1. HR and salary Discussion Round

Interview Preparation Tips

Interview preparation tips for other job seekers - This Company is Related to more physical work, working culture is not systematic
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the work process?
  • Q2. What a level up working
Round 2 - Technical 

(3 Questions)

  • Q1. What a idea target archives
  • Q2. What a idea target archives and level up
  • Q3. What a management system

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard worker, honestly and target archives .
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Group Discussion 

How to achieve our target working with our partners

Round 2 - Technical 

(2 Questions)

  • Q1. How many types of circuit breakers?
  • Q2. About in P.M.?
Round 3 - Case Study 

About in project work and how to easily complete our project?

Round 4 - HR 

(1 Question)

  • Q1. About in my self and my skills.

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly prepare with your CV and skills.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Face to face technical
  • Q2. Knowledge of All types pressure vessel and Heat exchanger
  • Q3. Drawing understanding
  • Q4. Problem solving
  • Q5. Manpower handling
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Artificial intelligence

Interview Preparation Tips

Interview preparation tips for other job seekers - Study basics and become self awared
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Quality system ,PQCDSM (productivity Quality Cost Deliver Safety Moral)
  • Q2. SOP SAP process
  • Q3. Working for experience
  • Q4. Any questions for experience
Round 3 - Technical 

(2 Questions)

  • Q1. Maintanence type
  • Q2. Company Achievement

Interview Preparation Tips

Topics to prepare for Grindwell Norton Quality Engineer interview:
  • Quality process
  • Quality Assurance
Interview preparation tips for other job seekers - For my experience, knowledge,
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Production line manufacturing

Round 2 - Technical 

(1 Question)

  • Q1. Knowledge skills
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

Only asking joining date

Round 2 - HR 

(2 Questions)

  • Q1. Wht your salary expectation
  • Q2. I only give u 15k

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go pitti
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Oil and gas industry rotating equipments experience must
  • Q2. Explain about pumps, fans , gearbox compressor motor generator
  • Ans. 

    Pumps, fans, gearboxes, compressors, motors, and generators are essential components in various mechanical systems.

    • Pumps are used to move fluids, such as water or oil, through a system.

    • Fans are used to create airflow for cooling or ventilation purposes.

    • Gearboxes are used to transmit power from one component to another at different speeds or torques.

    • Compressors are used to increase the pressure of a gas, such as in air ...

  • Answered by AI
  • Q3. Explain data collection process
  • Ans. 

    Data collection process involves gathering, recording, and storing information for analysis and decision-making.

    • Identify the data needed for analysis

    • Determine the method of data collection (surveys, interviews, observations, etc.)

    • Collect data using appropriate tools and techniques

    • Ensure data accuracy and reliability

    • Store data securely for future reference

    • Analyze collected data to draw conclusions and make decisions

  • Answered by AI
  • Q4. Explain team management & work management
  • Q5. Explain condition monitoring all tools
  • Ans. 

    Condition monitoring of tools involves regularly checking and analyzing the performance and health of tools to prevent breakdowns.

    • Regularly inspect tools for signs of wear and tear

    • Use sensors to monitor tool performance in real-time

    • Analyze data collected to predict potential failures

    • Implement preventive maintenance based on monitoring results

  • Answered by AI

Skills evaluated in this interview

Rucha Group Of Industries Interview FAQs

How many rounds are there in Rucha Group Of Industries PPC Engineer interview?
Rucha Group Of Industries interview process usually has 1 rounds. The most common rounds in the Rucha Group Of Industries interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Wipro Interview Questions
3.7
 • 5.6k Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Thermax Limited Interview Questions
4.2
 • 238 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
JSW Group Interview Questions
3.9
 • 106 Interviews
View all
Senior Engineer
23 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Production Engineer
17 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Assistant Manager
16 salaries
unlock blur

₹4.8 L/yr - ₹10.4 L/yr

Quality Engineer
12 salaries
unlock blur

₹1.2 L/yr - ₹3.8 L/yr

Engineer
10 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Rucha Group Of Industries with

Aditya Birla Group

4.1
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview