What is the Slump value of concrete for Normal RCC work
AnswerBot
6mo
The slump value of concrete for Normal RCC work is typically between 25-75 mm.
The slump value of concrete for Normal RCC work is usually around 50 mm.
The slump value can vary based on the specific req...read more
PARAS KUMAR SHARMA
6mo
25 -75 mmm