What is the curing formalities for our precast segment???

AnswerBot
1y

Curing formalities for precast segments involve a specific process to ensure strength and durability.

  • Pre-wetting the segments before casting

  • Covering the segments with wet burlap or plastic sheets

  • Maint...read more

Anonymous
5mo
The surface need curing because it is lying dry for long. If we do not cure with water, it will swallow the water from wet concrete and leave the structural work dry like open teeth. the concrete mass...read more
Deepak Kumar
5mo
Precasters typically achieve 28 day strengths at stripping times of 16 hours or less, depending on t...read more
Aditya Kumar Nepak
6mo
Curring provide to get higher strength to the concrete ,so that it can resist compressive forces
Anonymous
10mo
Minimum to maximum 7days to 28 days
Chaitali Sunil Amrutkar
10mo
The lap length of steel in the tension zone is typically longer than in the compression zone. This is because in the tension zone, the steel bars need to resist pulling forces, so they require more ov...read more
Anonymous
10mo
The curing formalities for precast segment is curing good strength construction concrete
Anonymous
10mo
Curing formalities for precast segments involve a specific process to ensure strength and durability.
Anonymous
1y

Curing formalities for precast segments involve a specific process to ensure strength and durability.

Pre-wetting the segments before casting

Covering the segments with wet burlap or plastic sheets

Maint...read more

Ajay kumar yadav
1y

Minimum 7day & maximum 28day

Anonymous
1y

The curing is very important our precast but not formalities

Anonymous
1y

Precast segment bridge

Anonymous
1y

Curing formalities for precast segments involve a specific process to ensure strength and durability. Pre-wetting the segments before casting Covering the segments with wet burlap or plastic sheets Ma...read more

Avanish Mishra
1y

Precast segment curing is cured for few days because the cement used is extra

Neha Harikesh Upadhyay
1y

Precast segment curing is cured for few days because the cement used is extra

Mohd Maroof
1y

Pond curing & wet surface curing use for precast

saroj kumar
1y

Precast segment curing is cured for few days because the cement used is extra hardening cement which gain the final strength in 3 day.


Pravesh Yadav
1y

Precast segment curing is cured for few days because the cement used is extra hardening cement which gain the final strength in 3 day

Mainly its curing is in the water bath for example railway sleeper...read more

kd
2y

Precast segment curing is cured for few days because the cement used is extra hardening cement which gain the final strength in 3 day

Mainly its curing is in the water bath for example railway sleepe...read more

noor mohammad
3y

Spreading, wrolled thik cloth around side

Add answer anonymously...
Larsen & Toubro Limited Civil Engineer Interview Questions
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter