Reliance Infrastructure
10+ Rolls-Royce Interview Questions and Answers
Q1. What are the types of fault arised in lighting
Types of faults in lighting include bulb failure, flickering, dimming, and power surges.
Bulb failure due to old age or manufacturing defects
Flickering caused by loose connections or faulty wiring
Dimming due to voltage drops or incompatible dimmer switches
Power surges caused by lightning strikes or faulty electrical systems
Other faults include buzzing sounds, overheating, and color distortion
Q2. What is MPLS and flow of labels in MPLS
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP address
MPLS improves network performance and enables traffic...read more
Q3. What is ticketing tool and what is DHCP
Ticketing tool is a software used to manage and track support tickets, while DHCP is a network protocol that assigns IP addresses to devices.
Ticketing tool helps IT teams manage and track support tickets efficiently
Examples of ticketing tools include Jira, ServiceNow, and Zendesk
DHCP stands for Dynamic Host Configuration Protocol
DHCP automatically assigns IP addresses to devices on a network
DHCP helps in managing IP address allocation and network configuration
Q4. Have you organise Operation, Maintenance of all Construction Plant & Machinery available on Project National Highway 72 Km. Answer: Sure
Yes, I have organized the operation and maintenance of all construction plant & machinery on Project National Highway 72 Km.
Implemented a comprehensive maintenance schedule for all construction plant & machinery
Ensured regular inspections and servicing of equipment to prevent breakdowns
Trained staff on proper operation and maintenance procedures
Maintained detailed records of maintenance activities and equipment performance
Coordinated with suppliers for spare parts and repairs
Q5. Do you agree for Designation D.G.M.-Plant & Machinery with Annual Salary Rs 21.5 Lakhs. on regular basis. Answer: Yes sure.
Yes, I agree to the designation of D.G.M.-Plant & Machinery with an annual salary of Rs 21.5 Lakhs.
Agree to the designation of D.G.M.-Plant & Machinery
Accept the annual salary of Rs 21.5 Lakhs
Committed to regular basis employment
Q6. What is route reflector in BGP
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in large service provider networks.
Route reflector can be con...read more
Q7. Percentage requirement of Preventive Maintenance. Answer: 100%
Preventive maintenance should be performed 100% of the time to ensure optimal functioning of the plant.
Preventive maintenance helps to identify and address potential issues before they become major problems.
Regular maintenance can extend the lifespan of equipment and machinery.
Preventive maintenance can help to reduce downtime and increase overall efficiency.
Examples: regular inspections, lubrication, cleaning, and calibration of equipment.
Q8. Preventive Maintenance meaning.
Preventive maintenance involves regularly scheduled inspections, repairs, and replacements to prevent equipment breakdowns and prolong the lifespan of machinery.
Regularly scheduled inspections to identify potential issues before they become major problems
Routine cleaning and lubrication to keep machinery running smoothly
Replacing worn out parts before they fail to prevent costly breakdowns
Implementing a preventive maintenance schedule based on manufacturer recommendations
Exam...read more
Q9. Detailing of lighting
Detailing of lighting refers to the process of designing and arranging lighting fixtures to achieve a desired effect.
Consider the purpose of the space and the desired atmosphere
Choose appropriate fixtures and bulbs for the space
Plan the placement of fixtures to evenly distribute light
Use accent lighting to highlight specific features or objects
Ensure proper wiring and installation for safety and functionality
Q10. Process of Resource planning
Q11. Time cycle of job
Top HR Questions asked in Rolls-Royce
Interview Process at Rolls-Royce
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month