Filter interviews by
Topic - social media
against and favor how is harmful and how is helpful
Top trending discussions
posted on 11 Sep 2021
I applied via LinkedIn and was interviewed in Mar 2021. There were 4 interview rounds.
posted on 14 Jun 2024
posted on 30 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
posted on 7 Apr 2024
posted on 1 Oct 2022
I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.
The number of stages of turbine blades varies depending on the specific turbine design and application.
Turbine blades are used in various applications such as gas turbines, steam turbines, and wind turbines.
The number of stages in a turbine refers to the number of sets of rotating and stationary blades.
Each stage of turbine blades helps to extract energy from the fluid passing through the turbine.
Gas turbines typically...
The total number of bearings in a turbine varies depending on its design and size.
The number of bearings in a turbine can range from a few to several dozen.
The main purpose of bearings in a turbine is to support rotating components and reduce friction.
Different types of bearings, such as ball bearings or roller bearings, may be used in a turbine.
Large turbines, such as those used in power plants, typically have more be...
Steam enters the turbine at the high-pressure stage.
Steam enters the turbine at the high-pressure stage to maximize energy extraction.
The high-pressure steam is directed into the turbine blades, causing them to rotate.
The steam then passes through multiple stages of the turbine, gradually losing pressure and expanding.
At each stage, the steam's energy is converted into mechanical work to drive the turbine.
Finally, the ...
I applied via Approached by Company and was interviewed in Oct 2022. There were 4 interview rounds.
My previous plant capacity was 5000 units per day.
My previous plant had a capacity of 5000 units per day.
I was responsible for managing the production of 5000 units per day in my previous plant.
The previous plant I worked at had a daily production capacity of 5000 units.
based on 1 interview
Interview experience
Production Supervisor
17
salaries
| ₹1.2 L/yr - ₹4.2 L/yr |
QC Chemist
8
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Assistant Manager
7
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Technician Fitter
6
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Executive Accountant
5
salaries
| ₹3.4 L/yr - ₹4.2 L/yr |
McNally Bharat Engineering
Sterling Oil Exploration & Energy Production
Kuwait National Petroleum Company
NTPC GE Power Services