i
Prochem Turnkey Projects
Filter interviews by
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Basic guidelines for sheet metal fabrication include material selection, design considerations, and proper tooling and equipment.
Choose the appropriate material for the desired application, considering factors such as strength, corrosion resistance, and cost.
Design the sheet metal part with proper dimensions, tolerances, and features to ensure manufacturability and functionality.
Consider bend radius, hole sizes, and ed...
Commonly used sheet-metal assembly processes include welding, riveting, and adhesive bonding.
Welding: Joining metal parts by melting and fusing them together, commonly used methods include spot welding, TIG welding, and MIG welding.
Riveting: Joining metal parts using mechanical fasteners called rivets, which are inserted through holes and then deformed to hold the parts together.
Adhesive bonding: Joining metal parts us...
Top trending discussions
posted on 31 Dec 2024
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
Logical reasoning questions, numerical reasoning questions and critical thinking questions
posted on 1 Jul 2022
I applied via Recruitment Consulltant
posted on 22 Jan 2024
I applied via Recruitment Consulltant
posted on 15 Aug 2021
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
Optimizing methane gas production involves efficient feedstock selection, process optimization, and waste management.
Selecting the right feedstock with high methane content
Optimizing the process parameters such as temperature, pressure, and pH
Implementing waste management techniques to reduce the buildup of inhibitory compounds
Using advanced technologies such as anaerobic digestion and membrane separation
Regular mainte
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 30 Sep 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
posted on 17 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Production Engineer
11
salaries
| ₹2.1 L/yr - ₹3.4 L/yr |
Project Engineer
10
salaries
| ₹3 L/yr - ₹3.7 L/yr |
Purchase Engineer
8
salaries
| ₹3.5 L/yr - ₹5.5 L/yr |
Design Engineer
6
salaries
| ₹3.5 L/yr - ₹11.8 L/yr |
Senior Project Engineer
5
salaries
| ₹4.9 L/yr - ₹6 L/yr |
Super Auto India
MELCO
Ferromatik Milacron
Devgiri Forgings