I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Top trending discussions
As an Instrument Technician, I have experience in calibrating and maintaining various instruments such as furnaces, operated by DCS or PLC.
I have experience in calibrating and maintaining instruments such as pressure gauges, temperature sensors, flow meters, and level transmitters.
I am familiar with DCS and PLC systems and can troubleshoot any issues that may arise.
I have worked with furnaces and have experience in mai...
Calibration of instruments inside furnace is crucial for accurate readings and safe operation.
Calibration should be done regularly to ensure accuracy
Instruments should be calibrated according to manufacturer's instructions
Calibration should be done in a controlled environment to minimize errors
Examples of instruments inside furnace that need calibration include temperature sensors, pressure gauges, and flow meters
I applied via Recruitment Consulltant and was interviewed before May 2021. There were 3 interview rounds.
Test your english knowledge and technology you knew for comoany requirement.
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I perform a variety of tests including diagnostic tests, troubleshooting tests, performance tests, and quality assurance tests.
Diagnostic tests to identify issues or problems
Troubleshooting tests to pinpoint the cause of malfunctions
Performance tests to evaluate the functionality of systems or equipment
Quality assurance tests to ensure products meet standards
Adhesion test is performed by applying a specific force to determine the strength of adhesion between two materials.
Prepare the surfaces to be tested by cleaning and ensuring they are dry
Apply a specific force to the surfaces, such as using a pull-off tester for coatings
Measure the force required to separate the materials to determine adhesion strength
Repeat the test multiple times for accuracy
Record and analyze the re
Raw materials for paint include pigments, binders, solvents, and additives.
Pigments: Provide color and opacity to the paint (e.g. titanium dioxide, iron oxide)
Binders: Holds the pigment particles together and adhere them to the surface (e.g. acrylic, alkyd)
Solvents: Help in the application and drying of the paint (e.g. water, mineral spirits)
Additives: Enhance properties like durability, flow, and drying time (e.g. ant
I applied via Job Portal and was interviewed in Sep 2022. There were 4 interview rounds.
To check mechanical seal, perform visual inspection, pressure test, and leakage test.
Perform visual inspection to check for any visible damage or wear on the seal
Conduct a pressure test to ensure the seal can withstand the required pressure
Perform a leakage test to check if the seal is properly sealing the joint
Check the temperature of the seal to ensure it is within the specified range
Check the lubrication of the seal
Runout of a shaft can be calculated by measuring the amount of deviation from a true circular path.
Use a dial indicator to measure the deviation of the shaft from a true circular path
Rotate the shaft and take readings at various points to get an accurate measurement
Calculate the average deviation to determine the runout of the shaft
Runout can be caused by various factors such as misalignment, bent shaft, or worn bearin
Utility load is calculated by determining the total power consumption of all devices connected to the utility grid.
Determine the power consumption of each device connected to the grid
Add up the total power consumption of all devices
Consider the time of day and season to account for varying energy demands
Factor in any renewable energy sources or backup generators
Use software tools to automate the calculation process
posted on 13 May 2023
posted on 15 Feb 2022
posted on 26 Aug 2023
I applied via Campus Placement and was interviewed in Feb 2023. There were 4 interview rounds.
3 different topics-food and culture pros and cons
The number of points that need inspection varies depending on the specific context and requirements.
The number of points needing inspection can be determined by the scope of the analysis or evaluation.
Factors such as the size of the dataset, complexity of the data, and specific objectives of the analysis can influence the number of points to inspect.
For example, in a quality control process, a certain percentage of pro...
Yes, Total Maintenance Loss (TML) is important for maintenance as it helps in identifying critical equipment and prioritizing maintenance activities.
TML is a key performance indicator used to measure the overall maintenance effectiveness of a system or equipment.
It helps in identifying equipment that is causing the most downtime or losses in production.
By analyzing TML, maintenance teams can prioritize their efforts on...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Production Engineer
27
salaries
| ₹4 L/yr - ₹8.1 L/yr |
Sales Coordinator
21
salaries
| ₹2.2 L/yr - ₹5.8 L/yr |
Senior Production Engineer
20
salaries
| ₹5.1 L/yr - ₹8 L/yr |
Distribution Assistant
14
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Manager
13
salaries
| ₹8 L/yr - ₹14 L/yr |
BASF
SABIC
Henkel Adhesives Technologies
Air Liquide