Filter interviews by
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 3 interview rounds.
Questions are given to solve in a given time.which include match reasoning english
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
Last round with President about your technical knowledgeable
posted on 16 Jan 2025
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
Questions related to heat treatment
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
The rejection control of the moulding machine is typically located on the control panel.
The rejection control is usually a button or switch on the control panel.
It may be labeled as 'reject' or 'scrap'.
The control allows the operator to manually reject any defective parts produced by the machine.
Some machines may also have an automatic rejection system that is programmed to detect and remove defective parts.
The locatio...
Injection moulding machine is located in the production area and problem solving involves identifying and resolving issues with the machine and the moulds.
Injection moulding machine is typically located in the production area
Problem solving involves identifying and resolving issues with the machine and the moulds
Common problems include issues with the temperature, pressure, and material flow
Solutions may involve adjust...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Types of injection molding machines include hydraulic, electric, and hybrid machines.
Hydraulic injection molding machines use hydraulic systems to generate the necessary pressure for the injection process.
Electric injection molding machines are more energy efficient and precise compared to hydraulic machines.
Hybrid injection molding machines combine the benefits of both hydraulic and electric machines.
Examples: Arburg ...
Assistant Manager
8
salaries
| ₹6.2 L/yr - ₹8 L/yr |
Technical Officer
7
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Internal Audit Officer
7
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Accountant
7
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Branch Accountant
7
salaries
| ₹3 L/yr - ₹3.6 L/yr |
JBM Group
Greaves Cotton
Goodyear
Shivam Autotech