Filter interviews by
Be the first one to contribute and help others!
Normal . Keep calm stay focused. Study hard work smart.
Great
I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality audits and inspections
Skilled in root cause analysis and implementing corrective actions
Proficient in using quality tools such as FMEA, Control Charts, and Pareto Analysis
I handle conflict by actively listening, seeking common ground, and finding solutions collaboratively.
I approach conflicts with a calm and rational mindset
I actively listen to all parties involved to understand their perspectives
I seek common ground and areas of agreement to build a foundation for resolution
I work collaboratively with others to find mutually beneficial solutions
I am open to feedback and willing to comp
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
1. Check sheets: Used to collect and analyze data in a systematic way.
2. Pareto chart: Helps identify the most significant factors contributing to a problem.
3. Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
4. Histogram: Represents data distribution...
The least count of a micrometer is the smallest measurement that can be read on the scale of the micrometer.
The least count of a micrometer is typically 0.01 mm or 0.001 mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the pitch of the screw.
For example, a micrometer with 50 divisions on the thimble and a pitch of 0.5 mm would have a least count of 0.01 mm.
STLC (Software Testing Life Cycle) outlines the phases of software testing from planning to closure.
1. Requirement Analysis: Understand testing requirements based on specifications.
2. Test Planning: Define the scope, resources, and schedule for testing activities.
3. Test Case Design: Create detailed test cases and scenarios to validate functionality.
4. Test Environment Setup: Prepare the environment where testing will ...
Waits in Selenium manage timing issues during automated testing, ensuring elements are ready for interaction.
Implicit Wait: Sets a default wait time for the entire session. Example: driver.manage().timeouts().implicitlyWait(10, TimeUnit.SECONDS);
Explicit Wait: Waits for a specific condition to occur before proceeding. Example: WebDriverWait wait = new WebDriverWait(driver, 10); wait.until(ExpectedConditions.visibilityO...
It was a good easy level test and prior preparation is importanat
PID controller is a feedback control mechanism used in engineering to regulate a system's output.
PID stands for Proportional-Integral-Derivative
It continuously calculates an error value as the difference between a desired setpoint and a measured process variable
It uses three control terms to adjust the output and bring the error to zero
It is widely used in industries such as manufacturing, robotics, and automation
Examp...
PLC stands for Programmable Logic Controller. It is a digital computer used for automation of electromechanical processes.
PLC is used to control industrial processes such as assembly lines, robotic devices, and packaging systems.
It uses a programmable memory to store instructions and execute them in a sequential manner.
PLC can communicate with other devices such as sensors, actuators, and human-machine interfaces.
It is...
posted on 16 Jun 2022
I applied via Referral and was interviewed before Jun 2021. There was 1 interview round.
posted on 8 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There was 1 interview round.
Easy...all basic questions
Coding about array ,string concepts
Aakash Educational Services
Frankfinn Institute of Air Hostess Training
Chandigarh University
NIIT