The clearance between punch pin and material depends on the material type, thickness, and punch diameter.
Clearance is the gap between the punch pin and the material being punched.
It is important to have the correct clearance to avoid damage to the punch and material.
Clearance can vary depending on the material type, thickness, and punch diameter.
A general rule of thumb is to have a clearance of 10-20% of the material t...
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2019. There were 6 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2023. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Production related issues can include equipment breakdowns, supply chain disruptions, and quality control problems.
Equipment breakdowns can cause delays and halt production entirely.
Supply chain disruptions can lead to shortages of raw materials or finished products.
Quality control problems can result in defective products and damage to the company's reputation.
Other issues may include inefficient processes, safety haz...
This question is asking me to respond quickly and without hesitation.
I understand the importance of quick thinking in a production engineering role
I will take a moment to gather my thoughts before responding
I will provide a clear and concise answer to the best of my ability
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Aptitude test
based on 32 reviews
Rating in categories
Territory Sales Incharge
293
salaries
| ₹3.6 L/yr - ₹13.9 L/yr |
Assistant Manager
236
salaries
| ₹6.2 L/yr - ₹17 L/yr |
Area Sales Manager
199
salaries
| ₹8.1 L/yr - ₹28.5 L/yr |
Sales Executive
185
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Territory Sales Manager
182
salaries
| ₹5.5 L/yr - ₹17 L/yr |
Vivo
OPPO
Dell
LG Electronics