i
Owens Corning
Filter interviews by
I applied via Recruitment Consultant and was interviewed before Jan 2021. There were 4 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Sep 2021. There were 3 interview rounds.
Test contains aptitude and technical questions
I applied via Recruitment Consultant and was interviewed in Jun 2019. There were 3 interview rounds.
Concrete mix design involves determining the proportions of ingredients to create a specific concrete mixture.
The mix design process considers factors such as strength, workability, and durability.
Ingredients typically include cement, water, aggregates, and admixtures.
The proportions of each ingredient are determined based on the desired properties of the concrete and the specific application.
For example, a mix designe...
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
Maintenance problems and solutions
Equipment breakdowns - regular maintenance checks and repairs
Lack of spare parts - inventory management and ordering in advance
Inefficient processes - process optimization and automation
Safety hazards - regular safety inspections and training
Environmental concerns - proper disposal of hazardous waste
Budget constraints - prioritization and cost-effective solutions
posted on 23 Nov 2019
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
The process for erection in complete pyro section involves assembling and installing all components for the pyro processing unit.
Prepare the site for erection by clearing the area and ensuring proper foundation
Assemble the various components of the pyro section such as kiln, preheater, cooler, and other equipment
Install the components according to the manufacturer's specifications and engineering drawings
Connect all ne...
posted on 14 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.
The silo method of cement is a storage system used in the construction industry to store bulk quantities of cement.
Silo method involves storing cement in tall, cylindrical structures called silos.
Cement is loaded into the silo from the top and discharged through the bottom using conveyor belts or air slides.
Silo method helps in efficient storage, handling, and transportation of cement on construction sites.
Examples of ...
Operations Engineer
437
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Oprating Engineer
97
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Production Engineer
66
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Senior Operations Engineer
57
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Production Supervisor
20
salaries
| ₹3 L/yr - ₹5 L/yr |
Nuvoco Vistas
Infra.Market
Jaquar
JSW Cement