Filter interviews by
About process
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2019. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a production line or machine is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality factors.
Availability measures the actual production time compared to the planned production time.
Performance measures the actual production rate compared to the ideal production rate.
Quality measures the good units produced compa...
Air compressor load requirements can be calculated by considering factors such as air demand, duty cycle, and pressure requirements.
Determine the required air demand by assessing the total air consumption of all connected equipment.
Consider the duty cycle, which is the percentage of time the compressor will be running.
Calculate the pressure requirements based on the highest pressure needed for any equipment or process.
...
The pillars in TPM are the foundational elements that support the implementation and success of Total Productive Maintenance.
1. Jishu Hozen (Autonomous Maintenance): Operators are responsible for routine maintenance tasks and inspections to prevent breakdowns.
2. Kobetsu Kaizen (Focused Improvement): Continuous improvement activities focused on specific areas to eliminate waste and improve productivity.
3. Planned Mainte...
AM step in TPM refers to Autonomous Maintenance, which involves operators taking responsibility for routine maintenance tasks.
Autonomous Maintenance (AM) is a key step in Total Productive Maintenance (TPM) implementation.
AM involves operators taking responsibility for routine maintenance tasks.
Operators are trained to perform basic maintenance activities like cleaning, inspection, lubrication, and tightening.
AM aims to...
To do prod planned, you need to create a production plan that outlines the tasks, resources, and timeline for completing the production process.
Identify the production requirements and goals
Determine the necessary resources, such as materials, equipment, and manpower
Create a detailed production schedule, including start and end dates for each task
Allocate resources effectively to ensure smooth workflow
Monitor progress ...
Budgeting involves creating a financial plan for a specific period, estimating income and expenses, and allocating resources accordingly.
Identify financial goals and objectives
Estimate income and expenses
Allocate resources based on priorities
Monitor and review the budget regularly
Make adjustments as necessary
posted on 21 Feb 2023
I applied via Naukri.com
Technical interview panel of min 3 conducts interview.
I have 5 years of experience as an Assistant Manager - Production in a manufacturing company.
Managed a team of 20 production workers and ensured smooth operations
Developed and implemented production schedules to meet customer demands
Monitored and optimized production processes to improve efficiency
Collaborated with other departments to resolve any production-related issues
Conducted regular quality checks to maintain pr...
The critical thing in my last company was implementing a new production system.
The challenge was to transition from the old manual production process to an automated system.
I led a team of technicians and engineers to evaluate different systems and select the most suitable one.
We faced resistance from some employees who were hesitant about the change.
To address this, I organized training sessions to familiarize them wi...
I applied via LinkedIn and was interviewed in Mar 2022. There was 1 interview round.
posted on 12 Nov 2021
I applied via Walk-in and was interviewed before Dec 2019. There were 5 interview rounds.
I applied via Company Website and was interviewed before Apr 2022. There were 4 interview rounds.
My strengths include attention to detail, problem-solving skills, and ability to work under pressure. My weaknesses include being overly critical of my own work and sometimes taking on too much responsibility.
Strength: Attention to detail - I have a keen eye for spotting errors and ensuring accuracy in production processes.
Strength: Problem-solving skills - I am able to quickly identify and resolve issues that may aris...
My key working areas include production planning, quality control, and process improvement.
Production planning: I have experience in creating production schedules, coordinating with different departments, and ensuring timely delivery of products.
Quality control: I am skilled in implementing quality control measures, conducting inspections, and ensuring adherence to quality standards.
Process improvement: I have a track ...
Yes, I am flexible for working in shifts and comfortable in the liquor industry as a female candidate.
I am open to working in different shifts and can adapt to changing schedules.
I have no issues working in the liquor industry and understand the nature of the business.
I am confident in my abilities to contribute effectively in a production role within the industry.
I am comfortable working in diverse environments and ca...
based on 3 reviews
Rating in categories
Senior Accounts Executive
15
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Assistant Manager
11
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Area Sales Executive
11
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Area Sales Manager
11
salaries
| ₹6 L/yr - ₹11.6 L/yr |
Sales Executive
9
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra