Filter interviews by
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
The unit of current is Ampere (A).
The unit of current is named after the French physicist Andre-Marie Ampere.
Current is the flow of electric charge per unit time.
1 Ampere is equivalent to 1 Coulomb of charge passing through a point in 1 second.
Top trending discussions
posted on 28 Sep 2024
I applied via campus placement at GLA Institute of Technology and Management, Mathura and was interviewed before Sep 2023. There were 2 interview rounds.
The level of test was Moderate
posted on 14 Dec 2017
I applied via Walk-in and was interviewed in Jan 2024. There were 7 interview rounds.
Electrical work in solar energy involves designing, installing, and maintaining electrical systems for solar power generation.
Designing and sizing solar power systems
Installing solar panels and inverters
Connecting solar panels to the electrical grid
Troubleshooting and repairing electrical issues in solar systems
Performing regular maintenance and inspections
Ensuring compliance with safety regulations and standards
Electrical equipment and field all activities
Electrical AC DC work field involves working with both alternating current (AC) and direct current (DC) in electrical systems.
AC (alternating current) is the type of electrical current commonly used in homes and businesses, while DC (direct current) is used in batteries and electronic devices.
AC current periodically changes direction, while DC current flows in only one direction.
In electrical work, understanding and wo...
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
25 QUESTIONS.
MODERATE
posted on 14 Feb 2024
posted on 28 Dec 2023
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
Assistant Manager
4
salaries
| ₹12 L/yr - ₹16.8 L/yr |
Senior Executive Engineer
3
salaries
| ₹9.1 L/yr - ₹12.7 L/yr |
Jakson Group
ReNew
Vestas
Wind World