A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two or more coils of insulated wire wound around a core
Primary coil receives electrical energy and induces a magnetic field in the core
Secondary coil receives the magnetic field and converts it back into electrical energy
Used to step up or step down voltage levels in power di
SCADA stands for Supervisory Control and Data Acquisition, while RTU stands for Remote Terminal Unit. SCADA is a system used for monitoring and controlling industrial processes, while RTU is a device that interfaces with sensors and actuators in the field.
SCADA is a centralized system used to monitor and control processes in industries such as power plants, water treatment facilities, and manufacturing plants.
RTU is a ...
Top trending discussions
posted on 17 Jan 2021
I applied via Referral
posted on 31 Oct 2023
posted on 30 Jun 2024
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
25 Civil Engineering related Questions
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
posted on 12 Nov 2024
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Project Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Scada Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Testing & Commissioning Engineer
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Substation Automation Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group