Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
The process for handing over new projects involves thorough documentation, training, and communication with stakeholders.
Create a detailed project handover document outlining project scope, objectives, timelines, and key deliverables.
Provide training to the team members who will be taking over the project to ensure a smooth transition.
Communicate with all stakeholders involved in the project handover to address any con...
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
posted on 10 Apr 2024
posted on 24 Nov 2024
I applied via Job Fair and was interviewed before Nov 2023. There was 1 interview round.
FMEA stands for Failure Mode and Effects Analysis, a systematic method for identifying and preventing potential failures in a product or process.
FMEA is a proactive approach used in various industries to identify and prioritize potential failure modes and their effects.
It involves analyzing the potential causes and consequences of failures, as well as the likelihood of their occurrence.
FMEA helps in developing actions ...
The 7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.
Check sheets: Used to collect and analyze data in a systematic way.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: A graphical representation of d...
DFM stands for Design for Manufacturing, knowledge of SAP refers to familiarity with the SAP software system.
DFM involves designing products in a way that makes them easier and more cost-effective to manufacture.
Knowledge of SAP includes understanding how to use the software for production planning, inventory management, and other manufacturing processes.
Having DFM knowledge can help streamline production processes and...
posted on 4 Feb 2025
I was interviewed before Feb 2024.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
The list count of vernier caliper is 20.
Vernier caliper has two scales - main scale and vernier scale.
The main scale has 10 divisions, each division is 1 mm.
The vernier scale has 9 divisions, each division is 0.9 mm.
The list count is the number of smallest divisions on the vernier scale that coincide with a division on the main scale.
In case of vernier caliper, the list count is 20.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. 5M is a method for improving workplace safety and efficiency. KPI stands for Key Performance Indicator.
5S focuses on organizing the workplace to improve efficiency and reduce waste.
5M stands for Man, Machine, Material, Method, and Measurement and is used to identify areas for improvement in workp...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Senior Software Engineer
138
salaries
| ₹6.8 L/yr - ₹24.9 L/yr |
Assistant Manager
98
salaries
| ₹7.2 L/yr - ₹18.5 L/yr |
Software Engineer
76
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Diploma Trainee Engineer
64
salaries
| ₹1.6 L/yr - ₹3.1 L/yr |
Senior Engineer
54
salaries
| ₹4.9 L/yr - ₹12.1 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane Group