Filter interviews by
I applied via Recruitment Consultant and was interviewed in Aug 2021. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
I plan to continue developing my technical skills and taking on leadership roles within the company.
Pursue advanced technical certifications
Lead cross-functional teams on complex projects
Mentor junior engineers
Explore opportunities for innovation and process improvement
Collaborate with senior management to set strategic goals
QA stands for Quality Assurance and involves processes to prevent defects, while QC stands for Quality Control and involves processes to identify defects.
QA focuses on preventing defects in the product or service being delivered
QC focuses on identifying defects in the product or service being delivered
QA involves processes such as reviews, audits, and process improvements
QC involves processes such as testing, inspectio...
General work related assignment
I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.
Solving questions paper
CAD &Solid work test
posted on 5 May 2022
I applied via Campus Placement and was interviewed before May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
GD&T stands for Geometric Dimensioning and Tolerancing, a system for defining and communicating engineering tolerances on drawings.
GD&T is a symbolic language used on engineering drawings to specify the allowable variations in form, size, and orientation of features.
It uses symbols, such as squares, circles, and triangles, to define the tolerance zones for features on a part.
GD&T helps ensure that parts are manufacture...
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
TPM (Total Productive Maintenance) activities focus on improving equipment reliability and reducing downtime. Why-Why analysis is a problem-solving technique to identify root causes.
TPM activities involve proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
Why-Why analysis is used to repeatedly ask 'why' a problem occurred to uncover the root cause
By identifying root causes through Wh...
posted on 7 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
The name of the press operation is not provided.
The least count of a micrometer is the smallest measurement that can be accurately read on the micrometer scale.
The least count is determined by the number of divisions on the micrometer scale and the pitch of the screw
It is calculated by dividing the pitch of the screw by the number of divisions on the scale
For example, if the pitch is 0.5 mm and there are 100 divisions on the scale, the least count would be 0.005 mm
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
Executive
13
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Assistant Manager
11
salaries
| ₹5.1 L/yr - ₹8.5 L/yr |
Production Engineer
8
salaries
| ₹2 L/yr - ₹4.2 L/yr |
HR Executive
7
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Maintenance Engineer
7
salaries
| ₹1.8 L/yr - ₹4.1 L/yr |
Trelleborg
PMT Machines
Venus Industrial Corporation
Ajay Industrial Corporation