Deduction as per IS code for Connecte, Shuttering & Plaster
AnswerBot
1y
Deduction as per IS code for Connecte, Shuttering & Plaster
As per IS code, deduction for connected items is 2.5% of the total quantity
For shuttering, deduction is 10% of the total surface area
For plas...read more
Amarnath madki
1y
Concreting = 0.5% to 1%
Plastering = .5 m² to 3 m²
Shuttering= 0
Totan Malik
2y
contractor shedule & ussor used
Add answer anonymously...