I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 4 interview rounds.
The previous process involved a manual system for data entry and tracking.
Data was entered manually into spreadsheets
Tracking of progress was done through email communication
There was no automated system for generating reports
The process was time-consuming and prone to errors
posted on 1 Nov 2023
I appeared for an interview in Aug 2024.
I have over 10 years of experience in senior executive roles, leading cross-functional teams and driving strategic initiatives.
Led a team of 50+ employees in a global technology company
Implemented cost-saving measures resulting in a 20% increase in profitability
Developed and executed strategic plans to expand market share in new regions
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 3 interview rounds.
Basic questions of engineering
A permit system is a formal process for granting permission to perform a specific task or activity.
Permit systems are commonly used in industries such as construction, mining, and manufacturing to ensure safety and compliance with regulations.
Permits may be required for activities such as hot work, confined space entry, or working at heights.
The permit system typically involves a written document outlining the work to ...
LMTD is calculated using the formula (ΔT1 - ΔT2) / ln(ΔT1 / ΔT2)
Calculate the temperature differences between the hot and cold fluids at the inlet and outlet of the heat exchanger
Subtract the temperature difference of the cold fluid from the temperature difference of the hot fluid
Take the natural logarithm of the ratio of the two temperature differences
Divide the difference in temperature by the natural logarithm value...
Cooling tower calculation involves determining the heat load, water flow rate, and cooling tower efficiency.
Calculate heat load by determining the difference in temperature between the hot water entering and the cooled water exiting the tower.
Determine water flow rate based on the heat load and the specific heat capacity of water.
Calculate cooling tower efficiency by comparing the actual heat rejected to the maximum po...
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
HR Executive
6
salaries
| ₹1.9 L/yr - ₹3.7 L/yr |
Sales Manager
6
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Deputy Manager
5
salaries
| ₹10.5 L/yr - ₹12 L/yr |
Sales Officer
5
salaries
| ₹3 L/yr - ₹5 L/yr |
IT Executive
4
salaries
| ₹3.6 L/yr - ₹3.6 L/yr |
Deccan Fine Chemicals
Gharda Chemicals Limited
IFFCO
FMC Corporation