Filter interviews by
I applied via Approached by company and was interviewed in Jul 2021. There were 2 interview rounds.
Instruments installation involves mounting and connecting various instruments to ensure proper functioning.
Instruments must be mounted securely and in the correct location
Wiring and tubing must be properly routed and connected
Termination points must be properly labeled and documented
Testing and calibration must be performed to ensure accurate readings
Examples of instruments include pressure transmitters, temperature se
The size of cable required for a 15 kW motor depends on factors such as voltage, current, and cable type.
The cable size is determined by the current rating of the motor.
The voltage drop across the cable should be within acceptable limits.
The cable type and insulation should be suitable for the motor's operating conditions.
Consulting electrical codes and standards can provide guidelines for cable sizing.
Example: For a 1...
Top trending discussions
posted on 6 Jul 2022
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
The number of IO's in a plant can vary depending on the size and complexity of the plant.
The number of IO's in a plant is typically in the hundreds or even thousands.
IO's (Input/Output) are used to connect sensors, actuators, and other devices to the control system.
Examples of IO's include digital inputs for switches, analog inputs for sensors, digital outputs for valves, and analog outputs for control signals.
Site Incharge
11
salaries
| ₹3.5 L/yr - ₹5.3 L/yr |
Executive Accountant
6
salaries
| ₹4.5 L/yr - ₹5.8 L/yr |
ETP Operator
6
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Plant Operator
5
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Process Engineer
4
salaries
| ₹3.8 L/yr - ₹4.5 L/yr |
Ion Exchange India
Thermax Limited
VA Tech Wabag
SUEZ Environnement