Q1. What is the latest model for solvingsewarge and drainage problem
The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.
Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.
Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.
These solutions can help reduce flooding, improve water quality, and enhance...read more
Q2. Area of exposure in the present irrigation projects
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
Q3. What is the problems of irrigation projects
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakdowns
Q4. Works which I had complited in nwda
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Q5. What is Ground clearance of overhead transmission line for different voltages like 440 Volt, 11 KV, 33KV, 132 KV etc ?
Q6. Which type of safety precautions you should apply while erecting overhead transmission line of different voltages ?
Q7. At what distance from centre line of roads having different pavement-width, transmission lines should be laid?
Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.
Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.
For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.
In contrast, for roads with wider pavement width, transmission lines can be pl...read more
Q8. Project report complited by me during service period
I have completed multiple project reports during my service period.
Led a team to compile and analyze data for a quarterly project report
Implemented new reporting tools to streamline the process and improve accuracy
Presented findings to senior management and stakeholders for decision-making
Ensured all reports were completed on time and met quality standards
Q9. Explanation to BC DBM